eDecks Queen Anne Fitting Instructions Manual Download Page 1

Step 1

FRAME TO BE LAID ONTO 

PAVING SLABS, OR ONTO 

GRASS OR SOIL

Please make sure the frame fits the requirements for your chosen kit.

Don’t forget to check your work with a level as you go!

Page 1 of 13

LAY YOUR FRAME

This may require

some cutting to fit your size 

requirements

Lay out your decking frame in your chosen location on the ground

www.eDecks.co.uk

All images are for illustration only, Please see individual item listings for actual item specifications

Queen Anne Fitting Instructions

Using the decking joists provided in the kit build the perimiter first then evenly spread the remaining 

decking joists inside as shown in the example above.

Use the joist screws provided in your fixing kit to secure the timbers as per method below.

METHOD FOR SCREWING JOISTS

JOISTS TOP VIEW

ANGLE SCREW

CORNER FASTENING

X2 SCREWS

X2 SCREWS

STRAIGHT FASTENING

JOIST

JOIST

JOIST

Summary of Contents for Queen Anne

Page 1: ...ground www eDecks co uk All images are for illustration only Please see individual item listings for actual item speci cations Queen Anne Fitting Instructions Using the decking joists provided in the...

Page 2: ...rutt will need to be set 200mm down into a concrete base leaving 400mm of each strutt exposed C Once raising strutts are securely set in concrete base lift the assembled joist frame to be level with t...

Page 3: ...se please select how high you would like the pergola posts please cut accordingly Each Pergola Post needs securing in each corner and depending on the size of the kit posts may need tting in between I...

Page 4: ...images are for illustration only Please see individual item listings for actual item speci cations Queen Anne Fitting Instructions Your step stringers must be set at a maximum of 600mm apart Use the 5...

Page 5: ...actly to the frame working in the opposite direction to the joist work when laying the boards make sure you leave a 5mm gap between each board to allow room for expansion www eDecks co uk All images a...

Page 6: ...e required to work around the step and riser of the 4 stringers installed in step 4 Step 6 Don t forget to check your work with a level as you go Page 6 of 13 INSTALL DECKING BOARD STEPS www eDecks co...

Page 7: ...steps FRONT Step 7 Don t forget to check your work with a level as you go Page 7 of 13 INSTALL FASCIA BOARDS www eDecks co uk All images are for illustration only Please see individual item listings...

Page 8: ...th a level as you go Page 8 of 13 INSTALL SUPPORT RAFTERS First secure the 3 supporting rafters to the posts www eDecks co uk All images are for illustration only Please see individual item listings f...

Page 9: ...RAFTERS Space the remainder of the rafters across the top of the support rafters www eDecks co uk Using the Pergola Clips Provided with your kit to secure All images are for illustration only Please s...

Page 10: ...10 Don t forget to check your work with a level as you go Page 10 of 13 INSTALL DIAGONAL CROSS SUPPORTS www eDecks co uk All images are for illustration only Please see individual item listings for a...

Page 11: ...s co uk All images are for illustration only Please see individual item listings for actual item speci cations Queen Anne Fitting Instructions Then complete the handrail section by xing the upper part...

Page 12: ...nstall to the kit Step 11 Cont d Once this is complete Sit back and enjoy Page 12 of 13 INSTALLTHE HANDRAILS www eDecks co uk All images are for illustration only Please see individual item listings f...

Page 13: ...e this is complete Sit back and enjoy Page 13 of 13 FINISH www eDecks co uk All images are for illustration only Please see individual item listings for actual item speci cations Queen Anne Fitting In...

Reviews: