![Edco CPL-8 Operator'S Instruction Manual Download Page 11](http://html1.mh-extra.com/html/edco/cpl-8/cpl-8_operators-instruction-manual_2357363011.webp)
CPL8-CPM-4-8-10-I-0416
Page 11
800-638-3326 • edcoinc.com • [email protected]
EQUIPMENT DEVELOPMENT CO., INC.
1. Remove plastic plug from belt guard, set aside for later use.
2. Use a socket wrench to loosen
left-hand thread
retaining nuts. Be sure the socket is over the outer retaining nut
only. The outer retaining nut has to be loosened first and removed, then remove the second retaining nut. Use
drift pin to hold the other end of the shaft during this procedure.
3. Be careful not to damage threads on end of shaft when removing or installing the drum. Support the weight of the
drum to minimize the possibility of damage.
4. With the
left-hand thread
retaining nuts removed, use a drift pin to turn the other end of the shaft in a
clock-
wise
direction for removal. Support drum during shaft removal so the drum will not fall when the shaft is removed,
possibly causing damage to machine and personal injury.
5. Once the drum is removed, maintenance and/or cutter replacement can be performed.
6. Reverse this procedure for reassembly insuring the drive studs are lined up with drive holes in drum before insert-
ing the main shaft. Be sure to install plastic plug removed in step #1.
CPL-8/CPM-8 DRUM REMOVAL / REPLACEMENT
RETAINING NUTS
(LEFT-HAND THREAD)
PLASTIC
PLUG
DRIVE
STUDS
DIRECTION OF
ROTATION
DRUM ASSEMBLY
MAIN SHAFT
TURN CLOCKWISE TO
REMOVE
TURN COUNTER-
CLOCKWISE
TO INSTALL.
RIGHT
WRONG