
Ecovim USA Inc. 320 S. Milliken Ave., Ste. H, Ontario, CA 91761 Ph: 909 605 5565 Fx: 909 605 1023
Eco – 250
Quick Start Check List
Check Shaft Rotation: “Standing in front of the machine”
Clockwise rotation to
EMPTY
(the paddles will turn away from you)
Counter-clockwise rotation for
NORMAL
operation (the paddles will turn towards you)
Check drain line:
Make sure line is not kinked, damaged, or obstructed in any way.
It cannot be coiled or submerged in water and must be angled down.
The drain line is a gravity drain; it
CANNOT
be placed into a bucket. Make sure drain line is no
higher than the drain exit point on machine
as this will cause the condensate to backup and the
machine will not work properly and the condensate may overflow onto the floor.
Check All Keys:
Make sure all keys work in all locks.
Check LED lights:
Make sure all LCD displays are functioning.
Check Clearance:
Make sure unit is placed
NO CLOSER
than 8” from a wall. Proper air circulation is required.
All doors must be capable of completely opening
Clean Filter:
AFTER EVERY CYCLE!
Clean Gasket Areas:
AFTER EVERY CYCLE
Do not use sharp instruments as it will damage the seals.