
06.11.2018 Rev. 08
11
5.
INSTALLATION
5.1.
Burner Installation Picture
Installation on the Boiler
Ø
In the installation of the burner, please only use the installation materials supplied with the burner.
Ø
Make sure that there are no gaps between the flange and boiler cover and ensure a full sealing by a
gasket.
Make sure that, when installing burner at tree pass boilers, the end point of flame pipe should be on
the same plane with the cover insulation material.
Asphalt plant application