![EcoNet EBV105 Quick Start Manual Download Page 3](http://html1.mh-extra.com/html/econet/ebv105/ebv105_quick-start-manual_2354939003.webp)
EBV105 mechanical installation: Universal Mounting kit (UMK) includes:
Caution:
After mechanical installation, check lever movement manually, by hand, before connecting to 12V power. To
be sure the valve mounting is correct, pull and hold the clutch pin open and make sure the lever movement,
by hand, is smooth. If not, check mechanical installation to ensure correct positioning.
Please contact us if the included mounted kit does not support your valve type/size as we have other
mounting kits available. (see installation video at