14
Decommissioning, disassembly, environmental protection
Personnel:
n
Operator
n
Mechanic
n
Service personnel
n
Specialist
Protective equipment:
n
Protective gloves
n
Chemical-resistant protective gloves
n
Protective eyewear
n
Safety shoes
DANGER!
Risk of injury due to the disregard of the specified personal protective
equipment (PPE)!
For all disassembly work, please respect the use of the PSA which is
specified on the product data sheet.
14.1 Decommissioning
DANGER!
The procedures described here may only be carried out by skilled
personnel as described at the start of the chapter, this may only be done
using PPE.
To take the equipment out of operation, proceed as follows:
1.
Remove the product canister.
2.
Immerse the suction lance in the water vessel.
3.
Start the unit until all lines and components are sufficiently flushed.
4.
Before carrying out any subsequent work, isolate the electrical supply completely
first of all and secure it against being switched on again.
5.
Relieve internal pressure of the pump and line pressure in the metering system.
6.
Drain off metering medium from the entire system without leaving any residue.
7.
Drain and remove operating fluids and consumables.
8.
Remove the remaining processing materials and dispose of them in an
environmentally-friendly way.
Decommissioning, disassembly, environmental protection
63
MAN049250 Rev. 1-01.2021