1.1 General information EN
For safety reasons it is important to read all of the
enclosed information (Installation guide, service
manual, spare parts, operating instructions) before
mounting this equipment. In addition, the legislation in
force at the time of purchase must always be consid-
ered in connection with installation and mounting of
this equipment, no matter the contents of this manual.
If there are matters of dispute please contact your
dealer.
This equipment is produced and tested by specially
qualified personnel according to approved instructions
to ensure our high level of product quality. After the
product is finished and tested it is manually inspected
with the ultimate test carried out just before the prod-
uct is released for shipping. To obtain our high level
of quality and long life we use stainless steel parts.
These parts, in defiance of our manual inspections
may still have some sharp edges, which can present
a cut hazard. Therefore, it is advised always to use
protective gloves and show caution when installing the
equipment.
1.2 Preparation
Note:
The pipeline must be rinsed through before
the system is connected. See service manual
1.3 Placing/application
• Do not use the machine outdoors.
• The Booster must be placed in frost-free rooms
only.
• Free space around the Booster: min 1000 mm.
1.4 Water supply
BFE3
Water amount
100 l/min.
Pressure
0,2 - 0,8 MPa (2 - 8 bar)
Max. temperature
70
o
C
The supply line must be sized so that it can supply the
minimum indicated pressure and water volume when
connected to this equipment. When dimensioning the
water supply. It is recommended to increase the avail-
able volume with 15-20% compared to the minimum
requirements listed in the table.
Note:
Recommended water hardness 14-18 dH°.
The equipment will operate with water hardness ex-
ciding this level however, descaling of pump system,
injectors and like must be expected depending on use
pattern and water quality.
1.5 Electric connection
Connection guide is mounted on the cable:
Always check direction of rotation.
Service switch:
A separate service switch must always be mounted
before the unit.
Note!
Installation always according to the country’s
legislation.
BFE3
Voltage:
380 - 415V
Frequency:
50 Hz
Motor effect:
5,5 kW
Nom. Voltage:
12,2 A
Fuse:
16 A
L1, L2, L3, PE
1,5 mm²
1.6 Piping
The pipe system should be made of stainless steel
pipes. The pipe joints should be made in a way that
makes separation possible in case of eg. repairs,
moving or similar.
All threads according to ISO 228
The dimensions stated are all indicative.
Always carry out calculations of the piping installation
based on pressure charts for piping and fittings
Pipe connections
BFE3
Recommended pipe dimen-
sions
5/4"
Pipe dimensions unit
5/4"
Note:
5/4” – 2” closing valve should be mounted on
the water supply immediately before the Booster and
dirt filter if any.
1.7 Assembly
Dimensions see fig.1.
Mount the Booster to the floor with the enclosed con
-
crete anchors.
3