Ecolab Aqua Balance Pure Comfort 2.0 User Manual Download Page 13

12 

 

PLUMBING YOUR SYSTEM

 

 

 

 

 

 

Your 

ECOLAB 

system can be plumbed using two different methods. Both will 

work fine, however, the following must be taken into account before making the 
decision of what method to use. 

 

 

 

 

1.  Your 

ECOLAB 

system requires a minimum of 75 Lpm of flow through the 

cell to produce the rated amount of chlorine. Be sure that if you use the 
pressure drop plumbing method [1] you have sufficient pressure drop across 
your filter to adequately flow 75 Lpm through the cell

 

2. When using the pressure drop plumbing method [1], you are sending 

un-filtered water through the cell, so you need to ensure that you clean the 
included strainer at least 1 time per week to remove any debris. Failure to 
clean the strainer will result in a lack of flow, reducing chlorine production, and 
ultimately reducing flow to the point that the flow switch de-activates the 
system. 

 

3. If you elect to use the bypass plumbing method [2], you will need to purchase 

a butterfly valve based on the size of the pipe you are using. This can 
sometimes be cost prohibitive, but the upside of this plumbing method is that 
you are sending filtered water through the cell, which reduces the frequency of 
needing to clean the strainer. Bypass plumbing method [2] also generally 
allows for more flow through the cell, which is recommended. 

 

4. Remember, always ensure that the return line from the 

ECOLAB 

cell is 

plumbed after the heater. 

Never 

plumb the return line before the heater, as 

you will be sending a high ppm of chlorine through heater, which may cause 
damage. 

 

 

 

5. No matter which plumbing method you use, you will always have to plumb the 

cooling line into box 3 (rectifier) using filtered water. This cooling line allows 
the heat sink in box 3 to cool the critical components. 

Summary of Contents for Aqua Balance Pure Comfort 2.0

Page 1: ...r spas a range of 3 0 5 0 ppm of free available chlorine must be maintained KEEP OUT OF REACH OF CHILDREN READ THE LABEL AND OPERATING MANUAL BEFORE USING REGISTRATION NO 29705 PEST CONTROL PRODUCTS A...

Page 2: ...ECOLAB Aqua Balance Pure Comfort Mineral Pool Spa System USER S GUIDE MODEL2 0...

Page 3: ...EPARING YOUR WATER BEFORE INSTALLATION 8 9 SALT CHART FOR CORRECT MAINTENANCE 10 TOOLS AND PARTS REQUIRED FOR INSTALLATION 11 INSTALLING YOUR SYSTEM PLUMBING 12 13 ELECTRICAL 14 SPECIFICATIONS AND FUS...

Page 4: ...5 0 ppm of free available chlorine must be maintained KEEP OUT OF REACH OF CHILDREN READ THE LABEL AND OPERATING MANUAL BEFORE USING REGISTRATION NO 29705 PEST CONTROL PRODUCTS ACT WARNING Operating t...

Page 5: ...Place St Paul MN 55102 INTRODUCTION Ecolab Inc 1 Ecolab Place St Paul MN 55102 1 800 354 5326 Patent US 6821398B2 EPA Est 082229 GA 001 NSF 50 UL 1081 listed Congratulations on purchasing your new EC...

Page 6: ...es of the titanium electrodes will not be honored if the system is operated in water temperatures lower than 15 degrees C ECOLAB warranties of the titanium electrodes will not be honored if the system...

Page 7: ...ystem never operates when the pumps are off All boxes on your ECOLAB system contain high voltage components Never open any box while power is on WARNING Heavy pool and or spa usage and higher temperat...

Page 8: ...duals can be protected from destruction by sunlight by addition of stabilizer cyanuric acid NOTE FOR USE ON SPAS For proper sanitation spas must be completely drained periodically The number of days b...

Page 9: ...ntil the salt has all dissolved You must never leave large amounts of salt on the surface of the pool as this may cause damage to the pool surface When you add the initial load of salt you will need t...

Page 10: ...e frequent calibration to ensure accurate readings failure to calibrate the equipment will result in inaccurate readings How to Calculate volume of a pool For a rectangular shaped pool Length ft x Wid...

Page 11: ...60 180 200 4400 6 60 120 180 240 300 360 420 480 540 600 4000 10 100 200 300 400 500 600 700 800 900 1000 3800 12 120 240 360 480 600 720 840 960 1080 1200 3500 15 150 300 450 600 750 900 1050 1200 13...

Page 12: ...you will need the following items not included to complete the installation Polypropylene tubing Flex PVC tubing Wall anchors Disconnect box fuse box conduit wiring and related material to supply 220v...

Page 13: ...uction and ultimately reducing flow to the point that the flow switch de activates the system 3 If you elect to use the bypass plumbing method 2 you will need to purchase a butterfly valve based on th...

Page 14: ...LER PRESENT THE OUTLET LINE THAT FEEDS THE CONTROLLER PROBES COULD BE CONNECTED TO THE RECTIFIER BYPASS MANIFOLD PLUMBING METHOD 2 NOTES THE RECTIFIER COOLING LINES MUST BE CONNECTED FROM THE SUCTION...

Page 15: ...110 120v outlet As above the cord labeled ORP must be plugged into a controller or a 120v outlet Your ECOLAB system must be wired to the main pump power supply so that if the pump is shut down the pow...

Page 16: ...for it If you are running your system manually you will need to find the point at which you keep a satisfactory level of chlorine in the water It may take several days to find this point If your ECOLA...

Page 17: ...ide of box 1 you will notice the amperage needle of the gauge on box 3 increases or decreases Higher amperage higher chlorine production Normal operating amps and volts for this model device are 2 0 1...

Page 18: ...m minerals will build up on the plates especially at the top of the cell This buildup needs to be cleaned by removing the cell from the housing and soaking it in a dilute muriatic solution 1 5 for abo...

Reviews: