Jet alignment
You can optimise the angle of the
jet during commissioning by trial
and error movements of the
incoming pipe angle.
Always support this pipe at the
optimum angle as part of the
commissioning process.
During manufacture, a jig is used
to obtain good jet alignment. The
jig is a 1mm wire that is held
centrally in the jet holder but can
be moved in and out. Alignment
is done by heat setting the case
material around each jet holder.
Problems arise when the jets are not supported prior to filling with water, as this pipe weight
can distort the heat set we put in the casing. Armed with a heat gun this can be fixed if the