background image

 © Ecoflo Wastewater Management Pty Ltd

   Page 6

 

°

• 
• 

Due to the variety of possible configurations, the vent kit supplied with your NL2 only includes the essential 

components. Additional DWV pipe and fittings may be required for a complete installation. 

NL2 ventilation pipe break-out view Figure 3 next page... 

IMNL

-

NL2

.

200423

Summary of Contents for Nalure Loo NL2

Page 1: ...Thank you for purchasing the NL2 Please read this manual carefully before installation Nature Loo is a brand of Ecoflo Wastewater Management Pty Ltd Visit our website at ecoflo com au IMNL NL2 200423...

Page 2: ...your local distributor or Ecoflo Wastewater Management for support if required Ecoflo Wastewater Management Pty Ltd www ecoflo com au www natureloo com au Phone 1300 138 182 Phone 07 3889 6144 Email i...

Page 3: ...Ecoflo Wastewater Management Pty Ltd Page 3 Table of Content 5 5 5 6 5 8 8 8 9 9 9 10 10 10 10 10 10 11 11 11 11 11 12 12 12 12 12 12 13 13 USING THE NL2 IMNL NL2 200423...

Page 4: ...SEAT Plastic Fitted 1 Ecoflo How To Use Sign 1 PLUMBING 25mmx1 2m Liquid Drain Hose Purple 1 25mmx1 BSP Camlock Set 1 50mm Wallace Seal greased sealed 1 50mm x 600mm PVC DWV Pipe 1 50mm 90 Deg Bend 1...

Page 5: ...ions exactly and contact Nature Loo for any installation questions Drain kit or excess fluid container if not purchased from Nature Loo The NL2 can be installed close to a wall with the vent pipe exit...

Page 6: ...ariety of possible configurations the vent kit supplied with your NL2 only includes the essential components Additional DWV pipe and fittings may be required for a complete installation NL2 ventilatio...

Page 7: ...Ecoflo Wastewater Management Pty Ltd Page 7 IMNL NL2 200423...

Page 8: ...mber can be located on the back of the unit Further details such as Nature Loo contact details design capacity operating condition electrical requirement and basic notice and instructions are located...

Page 9: ...Ecoflo Wastewater Management Pty Ltd Page 9 IMNL NL2 200423...

Page 10: ...ed below NL2 is ready to be used again As a general rule you should leave the material in the compost chamber as long as possible The NL2 has been designed for 2 people full time where the average mon...

Page 11: ...dditional compost chambers may be required Additional compost chambers can be purchased from Nature Loo Nature Loo recommends wearing protective clothing whenever handling waste products Recommended p...

Page 12: ...Ecoflo Wastewater Management Pty Ltd Page 12 IMNL NL2 200423...

Page 13: ...tewater Management Pty Ltd Page 13 recommended by Nature Loo would void your warranty Any faulty fan during the warranty period should be returned to Nature Loo before replacement can be provided IMNL...

Page 14: ...Ecoflo Wastewater Management Pty Ltd Page 14 IMNL NL2 200423...

Reviews: