
Fitting Instructions
Door Sequence Selector ECO SR Basis 2
SYSTEMTECHNOLOGY FOR THE DOOR
www.eco-schulte.de
Fax. 0(23 73) 92 76-70
Tel. 0(23 73) 92 76-0
58706 Menden
Iserlohner Landstraße 89
ECO Schulte GmbH & Co. KG
0432-CPD-0147
EN 1158:1997
+A1:2002
3
5
7
3
1
1
4
04
ECO Schulte GmbH & Co. KG
Iserlohner Landstraße 89
D-58706 Menden
280
240
220
200
180
160
700
800
900
1000
1100
1200
1300
Width of the door leaf B in mm
D
im
e
n
si
o
n
A
:
m
id
d
le
o
f
th
e
d
o
o
r
to
t
h
e
fu
lc
ru
m
o
f
th
e
d
o
o
r
se
q
u
e
n
c
e
s
e
le
c
to
r
in
m
m
140
120
1400
1500
600
500
260
1600
Thickness of the door leaf 60 mm
inactive leaf
active leaf
(door width B)
A
S
When establishing the dimen-
sion A provide for a safety gap
S
of min. 30mm when the
inactive leaf is closing.
Whenever the inactive leaf is
opened first the pushing flap
MK Basis-1 must open the ac-
tive leaf at least to a position
where the closing sequence
selector can keep it open.
This is another determinating
factor for the dimension A.
Measurements
Thickness of the door leaf 80 mm
Thickness of the door leaf 100 mm
2
0
45,5
60
120
535
Lowering
Bm8 DIN 74
ø
2
2
ø
1
8
9
3
0
Nut M8 DIN 439 SW 13
M8x20 with hexagon
4
4
7
max. 72°
min. 30°
45
Dimension A
40
5
0
25
50
4
5
8
0
1
1
3
23
80
ø16
Door leaf
Door frame
8
,1
socket SW 4
The door sequence selector is now screwed with M8x16
hexagon socket screws to the door frame. The cylinder
head stud is destined for the oblong hole. Please make
sure that the door sequence selector is running exactly
parallel to the door lintel when close. You can adjust the
horizontal position by loosening the cylinder head stud and
moving the door sequence selector slightly around the
countersunk head screw.
When in an upright position the telescopic arm must hit
exactly on the pivot of the support bracket on the active
leave (the last to close). The upright position of the teles-
copic arm can be adjusted with the adjustment screw at
the base of the door sequence selector. Make sure that af-
ter each adjustment the nut is properly tightened again .
The horizontal position of the sequence selector can be ad-
justed by the 4 adjustment screws on the fixing plate.
In order to establish the right position for the door se-
quence selector, see the chart and the sketch.
First of all fix both support brackets with the hexagon
socket screws (M8x16 DIN 7991) to the upper middle cor-
ners of both door leaves. The exact dimensions for the po-
sition can be found on the drawing.
Lubrification of the door sequence selector is not necessary.
Clean the door sequence selector now and then and verify
its horizontal position on the door frame and the correct up-
right position of the telescopic arm.
Maintenance:
Installation:
In case of any escape route or fire rating of the door these
demands must be taken into account when installing the
sequence controller. The user information should be han-
ded to the user of the unit.
Attention:
2
3
1
4
1
3
4 x M5
2
Leistungserklärung nach Verordnung (EU) Nr. 305/2011 finden Sie unter http://www.eco-schulte.de/leistungserklaerungen
Declaration of performance according to Regulation (EU) No 305/2011 see http://www.eco-schulte.de/declarationofperformance
Déclaration des performances conformément au règlement (UE) N° 305/2011 voir http://www.eco-schulte.de/declarationdesperformances
©
E
C
O
S
c
h
u
lt
e
G
m
b
H
&
C
o
.K
G
/
Ä
n
d
e
ru
n
g
e
n
v
o
rb
e
h
a
lt
e
n
!
/
S
R
B
a
si
s
2
/
M
T
S
1
5
0
0
8
/
3
3
9
2
0
6
1
0
1
/
I
n
d
e
x:
b