Eco-Systems RIO 10X10 Manual Download Page 3

STEP 01

PART:            QTY: 

DESCRIPTION:

POST 1   

RR125_8 Post Drilled for Internal Connector and Pre-Installed Door Hardware

POST 2   

RR125_8 Post Drilled for Internal Connector and Pre-Installed Door Hardware

BEAM 2   

Z45 Beam Formed w/ Locks

BEAM 3   

Z45 Beam Formed w/ Locks

BEAM 4   

Z45 w/ Door Stops

INFILL 1   

56.5625” x 45” Laminated Reco 

INFILL 3   

Reco Infill

STEPS: 

1- Attach BEAM 2 to Both POST 1 and POST 2

2- Attach BEAM 3

3- Insert INFILL 3 and Attached BEAM 2

NOTE: Door Hinge Channel Should be Above BEAM 3

STEPS: 

1- Slide INFILL 1 in place and Secure BEAM 2

2- Place and Secure BEAM4 and BEAM 3

POST 1

POST 2

BEAM 2

BEAM 2

BEAM 2

INFILL 3

BEAM 3

BEAM 3

BEAM 4

INFILL 1

PART 1

PART 2

Reviews: