![Eco-Systems RIO 10X10 Manual Download Page 3](http://html.mh-extra.com/html/eco-systems/rio-10x10/rio-10x10_manual_534409003.webp)
STEP 01
PART: QTY:
DESCRIPTION:
POST 1
1
RR125_8 Post Drilled for Internal Connector and Pre-Installed Door Hardware
POST 2
1
RR125_8 Post Drilled for Internal Connector and Pre-Installed Door Hardware
BEAM 2
3
Z45 Beam Formed w/ Locks
BEAM 3
2
Z45 Beam Formed w/ Locks
BEAM 4
1
Z45 w/ Door Stops
INFILL 1
1
56.5625” x 45” Laminated Reco
INFILL 3
1
Reco Infill
STEPS:
1- Attach BEAM 2 to Both POST 1 and POST 2
2- Attach BEAM 3
3- Insert INFILL 3 and Attached BEAM 2
NOTE: Door Hinge Channel Should be Above BEAM 3
STEPS:
1- Slide INFILL 1 in place and Secure BEAM 2
2- Place and Secure BEAM4 and BEAM 3
POST 1
POST 2
BEAM 2
BEAM 2
BEAM 2
INFILL 3
BEAM 3
BEAM 3
BEAM 4
INFILL 1
PART 1
PART 2