![Eco-Systems ECO-1036 Setup Download Page 6](http://html.mh-extra.com/html/eco-systems/eco-1036/eco-1036_setup_534394006.webp)
Locked layer contains
placeholder marks.
866.463.2611 • www.ecosystemsdisplays.com
Step 1
Locked layer contains
placeholder marks.
*** KEEP TSP3 EXTRUSIONS
ATTACHED TO HORIZONTALs &
VERTICALS. DO NOT REMOVE ***
When assembled
Item
1
2/2A
3/3A
4/4A
5/5A
Qty.
2
1/1
1/1
1/1
1/1
Description
8” x 22” oval Base Plate
42”h OP91 Vertical Extrusion w/ TSP3
42”h OP91 Vertical Extrusion w/ TSP3
42.5”w Z45 Horizontal Extrusion w/ TPS3
42.5”w Z45 Horizontal Extrusion w/ TPS3
Steps:
1) Connect Base Plates [1] to bottom of verticals [2,3], using bolts.
2) Assemble verticals [2-2A], [3-3A] together.
3) Attach horizontals [4-5], [4A-5A] between vertical assemblies [2/2A], [3/3A].
4) Apply SEG Graphic to assembled frame.
SEG groove of attached TSP3
must face
front
of assembly.
TSP3
groove
Slide TSP3 extrusion into
groove of vertical & tighten
set screw to secure in place.
1
1
2
2A
3
3A
4A
TSP3
TSP3
TSP3
TSP3
TSP3
TSP3
TSP3
TSP3
5A
4
5
SEG Graphic Installation
Corner A
Corner D
Corner B
Corner C
It is important to first insert
graphic into each alternate
corner, then to the sides of
the frame. If this is not done,
graphic will not fit into the
frame correctly.
Step 1
Insert corner A. Turn edge of
graphic so silicon welt is
perpendicular to face of
graphic. Insert narrow side
of welt with fabric to outside
into the channel. Repeat for
other side of this corner.
Step 2
Repeat Step 1 for opposite
corner C, then insert corner
B, followed by corner D, to
complete the installation of
the corners.
Graphic Removal
To remove the graphic from
the frame, locate the fabric
pull tab. Gently pull up on
the tab to remove the fabric.
Step 3
Once all corners are inserted,
press one silicon edge into
channel from corners and
work toward the center.
Make sure welt is fully inserted
into channel. Continue until
all sides are done. Smooth
out edges of graphic.