6
INSTALLATION
STEP
1
WIRING
4x
Position the PV Rack Assembly on top
of P3 battery box and align 4 holes. Feed
the PV cable through centre hole. Fasten
securely with hardware provided; nuts
and washers on the inside of P3a battery
box, and bolt head and rubber washer on
the outside.
PV Panel not depicted for
illustrative purposes only.
Connect the C1 controller and B1 battery using
the pre-wired cable set (colour/clip matched).
Load into the P3a battery box along
designated channels and connect the battery
and PV cables as per the drawing below.
STEP
2
BLUE
ISM-125
125W SOLAR PANEL CONNECTIONS
50W LAMP HEAD INTERNAL AND EXTERNAL CONNECTIONS
BATTERY BOX CONNECTIONS
J168-04-SS-G-60
J168-04-SS-G-60
Either MPPT1575-
DCR or MPPT2075-
DCR with 4-Pin PIR
Motion Sensor
BLUE
BLACK
BROWN
RED
INSIDE TO
LED
RE
D
BL
AC
K
BL
AC
K
W
HIT
E
GREEN
GROUND POINT
INSIDE LAMP HEAD
+
-
EARTH OF LAMP
POLE SYSTEM
MUST BE
CONNECTED TO
GROUND ROD
REFER TO LOCAL
CODE
GROUND
POINT INSIDE
BATTERY BOX
FHAC0002LXN
0287005.PXCN
5A FUSE
20A FUSE
WHITE
BLACK
4220311
4220311
ALL WIRING MINIMUM 14 Ga.
RING TERMINALS SIZED TO FIT WIRES SELECTED
PIR Sensor Connector
to In-line 4-Pin Free
Hanging Plug
CC-03BMMB-QL8APP CC-03BFFB-QL8APP
14/3 300-Volt Black Portable Power SJOOW Cord
FHAC0002LXN
0287020.PXCN
RE
D
BL
AC
K
GREEN
BLACK
WHITE
GROUND POINT TO
PANEL FRAME
BLACK
WHITE
4220311
4220311
14/3 300-Volt Black
Portable Power
SJOOW Cord
12V, 108Ah
CC
-03
BF
M
B-
Q
L8A
PP
CC
-03
BM
FB
-Q
L8A
PP