background image

Installation and User Instructions

CIPR-15Z NG/LP Generator

Mobile Gaseous Generator

March 2019
Version 1.0

Summary of Contents for CIPR-15Z NG/LP

Page 1: ...Installation and User Instructions CIPR 15Z NG LP Generator Mobile Gaseous Generator March 2019 Version 1 0 ...

Page 2: ...ant specific application or use thereof Neither Eco Power Equipment Ltd nor any of its affiliates or subsidiaries shall be responsible or liable for misuse of the information that is contained herein If you have any suggestions for improvements or amendments or have found errors in this publication please notify us All pertinent state regional and local safety regulations must be observed when ins...

Page 3: ... All trademarks are the property of their respective owners General Notice Some product names used in this manual are used for identification purposes only and may be trademarks of their respective companies Product Modifications Year Type Modifications 2019 1 CIPR 15Z V1 4 update Document Revisions Date Version Number Document Changes 14 07 2018 1 0 Initial Draft 15 02 2019 1 05 Version Two Draft...

Page 4: ...l 5 1 3 Explanation of Safety Warnings 6 1 4 Retaining Instructions 6 1 5 Obtaining Documentation and Information 7 2 0 Description of the product 8 2 2 Product specifications 10 2 4 Control Panel 13 2 5 Setup process 17 2 6 How to use safely 19 2 7 How to Tow the Product 20 3 0 Maintenance 21 4 ...

Page 5: ...s operating manual 1 2 Conventions Used in This Manual The following style conventions are used in this document Bold Names of product elements commands options programs processes services and utilities Names of interface elements such windows dialog boxes buttons fields and menus Interface elements the user selects clicks presses or types Italic Publication titles referenced in text Emphasis for ...

Page 6: ...n result in serious injury or death Follow all the instructions This will avoid fire explosions electric shocks or other hazards that may result in damage to property and or severe or fatal injuries The product shall only be used by persons who have fully read and understand the contents of this user manual and understand the safe operation of the machine Ensure that each person who uses the produ...

Page 7: ...back If you are reading Eco Power Equipment Ltd product documentation on the internet any comments can be submitted on the support website Comments can also be sent to support ecopowerequip com We appreciate your comments 1 5 5 Support and service For information about special tools and materials please contact Maxxcon Inc Address 8 26004 TWP 544 Sturgeon County AB T8T 0B6 Phone 1 844 332 0924 Web...

Page 8: ...ed above Using the machine for any other purpose could permanently damage the machine or seriously injure the operator or other persons in the area Machine damage caused by misuse is not covered under warranty The following are some examples of misuse Connecting a load that has voltage and frequency requirements that are incompatible with the machine output Overloading the machine with a device th...

Page 9: ...anged or the fuel supply line is worked on Fuel leaks should also be checked as part of the regular engine maintenance Depending on your engine and fuel system configuration your engine is designed to run on natural gas and or vapor LPG The fuel requirements for each are discussed below See the SPECIFICATIONS section for the required fuel supply pressures for each fuel Natural Gas Your engine is c...

Page 10: ...2 2 Product Specifications 10 ...

Page 11: ... Amp Efficiencies 60HZ 82 1 480V Full Load AVR DSE Digital Regulator Pole 4 Overspeed RPM 2250 Protection Class IP21 Altitude Rating 0 1000m Winding Code T0405S3 Standby H 163F 27C 15 2 kW 19 kVa Prime H 125 40 13 6 kW 17 kVa Engine Unit Engine Make Model Zenith 1 6L Gamma Configuration Inline 4 Cylinder Fuel Natural Gas or LPG Vapour Aluminum Radiator Shroud Pusher Fan Guard Governor Electric Tem...

Page 12: ...2 3 Product elements 12 ...

Page 13: ... panel The main user interface is within the main control panel door The control panel consists of a series of toggle switches and a graphical user interface to provide control of all operating system and provide the user with operating parameters 13 ...

Page 14: ...14 ...

Page 15: ...15 ...

Page 16: ...16 ...

Page 17: ...Alarm Icons 17 ...

Page 18: ...Note See Deep Sea 4510 MKII user manual for complete details on operation and troubleshooting 18 ...

Page 19: ...verify that there is fuel in the cylinder tank 8 If a natural gas fuel system is being used verify that the correct fuel supply pressure is being supplied to the engine 9 Read and understand ALL safety sections at the beginning of this manual 10 Ensure all maintenance procedures are up to date 11 Ensure unit is set up on firm and level ground with the area around the generator clean 12 Ground unit...

Page 20: ...cuit breaker this machine is designed to operate at 120 240v Single Phase 60 Hertz 25 Turn on the secondary circuit breakers as required note if you are not utilizing the secondary distribution it is recommended to leave these breakers in the off position during normal operation WARNING It is the operator s responsibility to ensure that the generator is properly and safely positioned at the locati...

Page 21: ...wer Equipment Never transport or move the generator while running Explosion Hazard Flammable gaseous fuel and combustible gases can be present in the generator Never charge a frozen 12V battery 2 6 2 Technical life span Gaseous Engine 10 000 hours Electric Fan System 5000 hours Eco Power recommends that our customers implement an inspection process regularly on equipment to ensure This product is ...

Page 22: ...hours Check air induction system for leaks Every 2000 hours PCV valve breather system inspection Every 1000 hours Inspect exhaust manifold and system for leaks Every 2000 hours Change Timing Belt Every 3000 hours Be Awesome Daily To achieve the proper engine performance and durability it is important that you use only engine lubricating oils of the correct quality in your engine Proper quality oil...

Page 23: ...nic throttle control ETC device 2 Stage converter engine control module ECM and a catalytic converter The system operates on slightly positive fuel pressure Primary fuel pressure can be measured at the LD 2 Stage converter Secondary fuel pressure command and actual fuel pressure is monitored by the ECM You can view these pressures using the diagnostic service tool 23 ...

Page 24: ...ck for leaks Check engine oil level Check coolant level Inspect generator end and power wiring Monitor oil pressure voltage 3 4 2 Semi Annual Inspection tasks Task Action Inspect generator bearing Remove end plate and inspect check L dims Load Test Load Test Gaseous Engine more in light load conditions 24 ...

Page 25: ...25 ...

Page 26: ...THIS PAGE INTENTIONALLY LEFT BLANK 26 ...

Reviews: