E93.1801EN171 HWB installation manual
118
21
USER INSTRUCTIONS
After installing and commissioning of the water heater, demonstrate the operation of the entire central heating
system to the end-user. The user should be made familiar with all safety precautions of the water heater and the
installation. The user should be instructed that service and maintenance of the water heater is required every
twelve months. Regular service and maintenance are essential for a safe and proper operation of the water heater.
Hand over the documents supplied with the water heater.
Summary of Contents for HWB-299
Page 2: ......
Page 7: ...E93 1801EN171 HWB installation manual 7 1 SAFETY GUIDELINES...
Page 8: ...E93 1801EN171 HWB installation manual 8 CONSIGNES DE S CURIT...
Page 65: ...E93 1801EN171 HWB installation manual 65 Ladder Logic Diagram...
Page 66: ...E93 1801EN171 HWB installation manual 66 Electrical schematics...
Page 67: ...E93 1801EN171 HWB installation manual 67...
Page 119: ...E93 1801EN171 HWB installation manual 119 22 SPARE PARTS...
Page 120: ...E93 1801EN171 HWB installation manual 120 68 68 73...
Page 123: ......