E93.9950EN CB Cascade manual
15
8. Mounting the frame
8.1
Frame elements
The first part of the actual installation of the cascade configuration is assembling
the frame on which the boilers
will be hung.
The basic frame exists of the following elements:
•
L-shaped stands
•
Top beam
•
In-between beam (middle beam)
•
Mounting material (bolts, washers)
1
Locking strip
2
In-between beam
3
Top-beam
4
L-stand
5
Rectangular
seal plug 70x50
6
Bolt M8x25 DIN933
7
Washer M8 DIN 125-1A
B
Figure 8.1 Frame elements