![Eclipse Pure 1200 Operating Manual Download Page 20](http://html1.mh-extra.com/html/eclipse/pure-1200/pure-1200_operating-manual_3947713020.webp)
Host body installation precautions:
It is necessary to confirm with the community property first whether the wall can be opened.
Try to choose the leeward side of the air outlet, especially in the northern area.
The installation location of the main engine must be able to bear the weight of the unit,
and cannot be installed on a hollow plywood wall or outdoors.
The fuselage should be straightened as much as possible, and the installation position
should be selected to be conducive to indoor air circulation, and the air inlet and outlet
should not be blocked by obstacles; the upper and lower fuselage should be kept at a
distance of more than 30CM from the ground and ceiling.
The location of the opening should be as far away as possible from beams, doors,
windows, etc., so as not to damage the load-bearing or steel structure of the wall;
and make sure that there are no obstacles such as power lines, water pipes, and
steel bars on the wall.
Adequate maintenance, easy access and adequate ventilation are required.
When drilling holes, pay attention to safety and environmental protection, and keep
away from non-construction personnel (especially the elderly and children); avoid
contaminating the ground, walls and furniture.
Installation Notes
17