9
Before you start
Before you start
Packing list
Assembly
U-handle version
U-handle assembly
1. Install handle assembling bracket (upper) (A) in handle as-
sembling bracket (lower) (D) and fix handle by tightening
handle assembling bolt (8 mm) (B) lightly.
2. Adjust inclination of handle to adequate position (easy to op-
erate) and tighten firmly handle assembling bolt.
C: Washer
The following parts are packed separately in the packing box.
When you have unpacked the box, please check the parts that it contains.
Contact your dealer if anything is missing or broken.
1. Engine and shaft tube
2. U-handle
3. Shield (for nylon line cutting head)
4. Shield (for metal blade)
5. Safety goggles (ANSI Z 87.1 compliant)
6. Caution
tag
7. Shoulder
harness
8. Nylon line cutting head
9. 3
cutter
blade
10. Blade cover
11. Operator's manual
12. Locking tool
13. Socket wrench
14. L-wrench
WARNING
Read the operator's manual carefully to ensure that you assemble the product correctly.
Using a product that has been incorrectly assembled could lead to an accident or serious injury.
Summary of Contents for SRM-520ES/U
Page 2: ......
Page 15: ...13 Before you start NOTE If you replace the band attach it as shown in the illustration...
Page 16: ...14 Before you start...
Page 45: ...13 Bevor Sie beginnen HINWEIS Wenn Sie das Band austauschen befestigen Sie es wie abgebildet...
Page 46: ...14 Bevor Sie beginnen...
Page 76: ...14 Prima di iniziare...
Page 105: ...13 Antes de comenzar NOTA Si sustituye la cinta col quela como se muestra en la ilustraci n...
Page 106: ...14 Antes de comenzar...
Page 123: ......