P
OWER
P
RUNER
TM
O
PERATOR
'
S
M
ANUAL
15
E
D
F
G
H
G
H
I
J
2.
Loosen center clamp knob (F) turning counter clockwise.
3.
Pull upper shaft tube (G) out of fiberglass lower shaft tube 127-152
mm (5-6 in.), then slide (G) back into fiberglass lower shaft tube
exposing inner power transmission shaft (H). Align and join star
shaped drive end of inner power transmission shaft (H) with cutting
attachment shaft (I).
4.
Align ridges on upper shaft tube (G) with seams in cutting attach-
ment.
5.
Slide together aligning locator screw (E) in cutting attachment with
locating hole (J) in upper shaft tube.
6.
Tighten locator screw (E). Tighten four (4) cutting attachment
screws (D).
7.
Extend upper shaft tube to desired length. Tighten center clamp
knob (F) turning clockwise.
THROTTLE
LINKAGE
AND
IGNITION
LEADS
1.
Close choke and remove air filter cover.
2.
Loosen nut (A) and place threaded end of throttle linkage in
bracket slot. Finger tighten nut (A).
3.
Place inner cable in slot of carburetor swivel (B) and tighten nut
(A).
4.
Check throttle for freedom of movement and that wide open throttle
/ low idle extremes are adjusted properly. If adjustment cannot be
achieved with adjusting nuts, consult with your Echo Dealer for
correct adjustment procedure.
5.
Connect ignition stop leads (C) and (D).
6.
Bundle and secure ignition leads against engine housing with clip
(E).
7.
Install air filter and cover.
C
A
B
D
E