![Echo P44514001001 Operator'S Manual Download Page 23](http://html1.mh-extra.com/html/echo/p44514001001/p44514001001_operators-manual_4093057023.webp)
PB-580 H/T
OPERATION
X7505200601
23
© 04/2015 ECHO Inc.
6. Additional speed may be necessary to clean grass and
leaves from a lawn or flower bed.
7. Higher speed may be necessary to move gravel, dirt, snow,
bottles or cans from a driveway, street, parking lot or
stadium.
8. Always stop unit using stop engine procedure.
Note: Never use a higher speed setting than necessary to perform a task. Remember, the higher the engine
speed, the louder the blower noise.
9. Minimize dust by using blower at lower speeds or dampen surface with water. Blower can be used to
clean most surfaces when water conservation is desired.
10. Use the full blower pipe configuration when blowing.
11. After using blowers and other equipment, CLEAN UP! Dispose of debris in trash receptacles.
Contacting blower pipe tip on abrasive surfaces can create sharp cutting edges and can result in
personal injury if touched. Do not scrape or drag blower pipe tip when operating or transporting
unit. Replace blower pipe assembly if protective metal ring is worn, cracked or deformed.
Cold Weather Operation
Plug
For operation in cold weather, install plug in cold weather
position (D), otherwise icing can occur.
For operation in normal weather, install plug in warm weather
position (C), otherwise over heating can occur.
For more information
scan this QR code.
C
D