At least 2 people are required to unpack the log
splitter package. Take the following steps to put
the Log Splitter on the ground by tipping every
side of the carton by 45 degree. Make sure put
Block (B) to support the Log Splitter package
(A) at the point a little higher than the middle.
The other side of Block (B) shall be against
steady objects, such as a wall. Wedge (C) shall
be arranged under the tipped Log Splitter
Package (A) every step to avoid slipping. Then
remove the carton off the Log Splitter.
This log splitter is designed for operating under
ambient temperatures b5
o
C and 40
o
C
and for installation at altitudes no more than
1000m above M.S.L. The surrounding humidity
should be less than 50% at 40
o
C. It can be
stored or transported under ambient
temperatures between -25
o
C and 55
o
C.
7
Maintain your log splitter with care. Always clean
the unit after each use. Keep the log splitter
clean for best and safest performance. Follow
instructions for lubricating. Inspect all hydraulic
seals, hoses and couplers for leaks prior to use.
Control levers and power switch must be kept
clean, dry and free from oil and grease at all
times.
Make the workshop childproof. When not in
use, lock the unit in the workshop. Store the log
splitter away from children and others not
qualified to use it.
APPLICATION CONDITIONS
UNPACKING
1
2
3
4
5
A
B
C
A
B
C
A
B
C
A
B
C