GB
12
ASSEMBLY
Tools required for the assembly:
1A – Wooden crossbar assembly
Use the wall board as a template. Make sure that it is level, mark the mounting holes into the centre of the
wooden post. Drill holes 3 mm in diameter and 50 mm deep. Align the wall board into a level position and
use long bolts (H) and washers (F) to anchor the board to the wall. Tighten the bolts fi rmly, but not too much.
Wooden post
Wooden post
1B – Concrete wall assembly
Apply the wall board to the wall, align into a level position and use it as a template to mark the holes. Drill holes
8 mm in diameter and 55 mm deep. Insert dowels (I) and long bolts (H) with washers (F) into the holes and
tighten the wall board to the wall. Tighten the bolts fi rmly, but not too much.
Concrete wall
Concrete wall