M3G084 / M3G112
Disassembly instructions
Document no.: - • Change: 01 • Release date: 2019-02-12 • (VM-POK) • Page 6/7
ebm-papst Mulfingen GmbH & Co. KG • Bachmühle 2 • 74673 Mulfingen • Germany
Phone +49 7938 81-0 • Fax +49 7938 81-110 • [email protected] • www.ebmpapst.com
3.4.
Removing the ball bearing
17.
Position the puller in the center and screw it on.
18.
Unfasten the ball bearing by turning the spindle of the puller in clockwise
direction.
19.
Take the ball bearing out of the puller and remove the two washers from
the rotor bell.