background image

Operating instructions

W4E300-CA09-51

Translation of the original operating instructions

3. TECHNICAL DATA

3.1 Product drawing

All dimensions in mm.

1

Direction of air flow "V"

2

Cable PVC 4G AWG20, 4x crimped splices

Item no. 13158-5-9970 · ENU · Change 94799 · Approved 2017-10-27 · Page 4 / 10

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for W4E300-CA09-51

Page 1: ...and otherwise used by suitably qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the elect...

Page 2: ...coming into contact with the rotor or the impeller Secure the device against accidental contact Before working on the system machine wait until all parts have come to a standstill WARNING Rotating de...

Page 3: ...s Improper use In particular operating the device in the following ways is prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Reson...

Page 4: ...roduct drawing All dimensions in mm 1 Direction of air flow V 2 Cable PVC 4G AWG20 4x crimped splices Item no 13158 5 9970 ENU Change 94799 Approved 2017 10 27 Page 4 10 ebm papst Mulfingen GmbH Co KG...

Page 5: ...earth Conformity with standards EN 60335 1 CE Approval UL 507 With regard to cyclic speed loads note that the rotating parts of the device are designed for a maximum of one million load cycles If you...

Page 6: ...2 1 Requirements Check whether the information on the nameplate matches the connection data If the motor run capacitor was not installed by ebm papst check whether the information on the motor run ca...

Page 7: ...e should be routed in a U shaped loop wherever possible If this is not possible a drip edge can be produced by fitting a cable tie directly in front of the cable gland for example Fans installed lying...

Page 8: ...uctions 4 4 Connection diagram U1 blue Z brown U2 black PE green yellow Item no 13158 5 9970 ENU Change 94799 Approved 2017 10 27 Page 8 10 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfingen...

Page 9: ...MAINTENANCE MALFUNCTIONS POSSIBLE CAUSES AND REMEDIES Do not perform any repairs on your device Send the device to ebm papst for repair or replacement WARNING Live terminals and connections even with...

Page 10: ...regard to the disposal of products or waste occurring in the various phases of the life cycle The corresponding disposal standards are also to be heeded 5 3 2 Disassembly Disassembly of the product mu...

Reviews: