3. TECHNICAL DATA

3.1 Product drawing

All dimensions in mm.

1

Direction of air flow "V"

2

Cable diameter min. 4 mm, max. 10 mm, tightening torque 4 ± 0.6 Nm

3

Tightening torque 3.5 ± 0.5 Nm

Item no. 50923-5-9970 · ENU · Change 211238 · Approved 2020-10-15 · Page 4 / 13

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for W3G710-GU30-11

Page 1: ...ecialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules The safety hazards associated w...

Page 2: ...g in conjunction with open and closed loop control devices If impermissible radiation levels occur following installation appropriate shielding measures have to be taken by the user NOTE Electrical or...

Page 3: ...tenance work Conveying air at an ambient air pressure between 800 mbar and 1050 mbar Using the device within the permitted ambient temperature range see Chapter 3 6 Transport and storage conditions an...

Page 4: ...s in mm 1 Direction of air flow V 2 Cable diameter min 4 mm max 10 mm tightening torque 4 0 6 Nm 3 Tightening torque 3 5 0 5 Nm Item no 50923 5 9970 ENU Change 211238 Approved 2020 10 15 Page 4 13 ebm...

Page 5: ...ta is determined using a motor impeller combination in a standardized measurement setup 3 4 Technical description Weight 42 8 kg Size 710 mm Motor size 150 Rotor surface Painted black Electronics hous...

Page 6: ...lation engineer or operator owner of the device to ensure if necessary after consultation with the network operator that this device is only connected to a connection point with a Ssc value that is gr...

Page 7: ...rding to EN 61800 5 1 Compliance with the resistance specifications according to EN 61800 5 1 for the protective earth connection circuit must be verified in the end application Depending on the insta...

Page 8: ...ith the seals provided in the terminal box Route the wire s not included in scope of delivery into the terminal box First connect the PE protective earth Connect the wires to the corresponding termina...

Page 9: ...de for the device by ebm papst Mode parameter set 1 PWM control Mode parameter set 2 PWM control Fan device address 01 Max PWM 100 Min PWM 5 Save set value to EEPROM No Set value requirement Analog li...

Page 10: ...nics enable pin open or applied voltage 5 50 VDC disable bridge to GND or applied voltage 1 VDC reset function triggers software reset after a level change to 1 VDC SELV KL 3 8 Din2 Digital input 2 Sw...

Page 11: ...supply Switching off the device for maintenance Switch off the device via the control input Do not switch the motor e g in cyclic operation on and off via power supply Disconnect the device from the p...

Page 12: ...ly for proper operation and soiling The frequency of checking is to be adapted accordingly depending on the degree of soiling DANGER Risk of injury from rotating fan Only clean when not in motion Do n...

Page 13: ...rve the applicable country specific legal regulations with regard to the disposal of products or waste occurring in the various phases of the life cycle The corresponding disposal standards are also t...

Reviews: