background image

Operating instructions

W2G110-AK43-31

Translation of the original operating instructions

4. CONNECTION AND START-UP

4.1 Connecting the mechanical system

CAUTION
Cutting and crushing hazard when removing the device
from the packaging

Blades can be bent
→ Carefully remove the device from its packaging, only

touching the wall ring. Make sure to avoid any shock.

→ Wear safety shoes and cut-resistant safety gloves.

;

Check the device for transport damage. Damaged devices must no
longer be installed.

;

Install the undamaged device according to your application.

4.2 Connecting the electrical system

CAUTION
Electrical voltage

The fan is a built-in component and features no electrically
isolating switch.
→ Only connect the fan to circuits that can be switched off with

an all-pole separating switch.

→ When working on the fan, you must switch off the

installation/machine in which the fan is installed and secure it
from being switched on again.

NOTE
Water penetration into leads or wires

Water enters at the cable end on the customers side and can
damage the device.
→ Make sure that the cable end is connected in a dry

environment.

Operate the device with a safely isolated power pack.

4.2.1 Prerequisites

;

Check whether the data on the type plate agree with the connection
data.

;

Before connecting the device, ensure that the supply voltage matches
the operating voltage of the device.

;

Only use cables designed for current according to the type plate.
For determining the cross-section, follow the basic principles in
accordance with EN 61800-5-1. The protective earth must have a
cross-section equal to or greater than the outer conductor cross-
section.
We recommend the use of 105°C cables. Ensure that the minimum
cable cross-section is at least
AWG26/0.13 mm².

4.2.2 Idle current

Because of the EMC filter integrated for compliance with EMC
limits (interference emission and interference immunity), idle
currents in the mains cable can be measured even when the
motor is at a standstill and the mains voltage is switched on.

4.3 Connection via plug

4.3.1 Preparing connection lines for the connection

The lines, including customer-side interface, fall within the
standard of the internal connection.
Observe product conformity to standards and the type of
protection in your end device after you have installed the ebm-
papst device.

;

Connect the connection lines to the mating connectors.

Item no.: 50872-5-9970 · Revision: 71812 · Print-out: 2012-02-24 · Y. Uhlmann (VM-TDO) · Page 6 / 9

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 7938 81-0 · Fax +49 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for W2G110-AK43-31

Page 1: ...d authorised specialist personnel are permitted to transport unpack assemble operate or maintain the device or to use it in any other manner 1 3 Basic safety rules 1 1 3 Basic safety rules Any safety hazards stemming from the device must be re evaluated once it is installed in the end device Observe the following when working on the unit Do not make any modifications additions or conversions to th...

Page 2: ... come to a standstill WARNING Rotating device Long hair loose items of clothing and jewellery could become entangled and pulled into the device You could be injured Do not wear any loose clothing or jewellery while working on rotating parts Protect long hair by wearing a cap 1 8 Emission WARNING Depending on the installation and operating conditions a sound pressure level greater than 70 dB A may ...

Page 3: ...llowing ways is particularly prohibited and may cause hazards Operating the device with an imbalance e g caused by dirt deposits or icing Moving air that contains abrasive particles Moving highly corrosive air e g salt spray mist Exceptions are devices that are intended for salt spray mist and protected accordingly Moving air that contains dust pollution e g suctioning off saw dust Operating the d...

Page 4: ...of products All measures have the unit mm 1 Direction of air flow A 2 2 x flat plugs 2 8x0 5 AMP no 170058 2 Item no 50872 5 9970 Revision 71812 Print out 2012 02 24 Y Uhlmann VM TDO Page 4 9 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 7938 81 0 Fax 49 7938 81 110 info1 de ebmpapst com www ebmpapst com ...

Page 5: ... Ball bearing Electrical leads With plug Motor protection Reverse polarity and locked rotor protection Product conforming to standard EN 60950 1 Approval UL 507 CSA C22 2 Nr 113 For cyclic speed loads note that the rotating parts of the device are designed for maximum one million load cycles If you have specific questions contact ebm papst for support 3 4 Mounting data For depth of screw see chapt...

Page 6: ...eck whether the data on the type plate agree with the connection data Before connecting the device ensure that the supply voltage matches the operating voltage of the device Only use cables designed for current according to the type plate For determining the cross section follow the basic principles in accordance with EN 61800 5 1 The protective earth must have a cross section equal to or greater ...

Page 7: ...signment 1 1 UN 24V red Power supply 24 V voltage range refer to rating plate residual ripple 3 5 1 2 GND blue Reference mass Item no 50872 5 9970 Revision 71812 Print out 2012 02 24 Y Uhlmann VM TDO Page 7 9 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 7938 81 0 Fax 49 7938 81 110 info1 de ebmpapst com www ebmpapst com ...

Page 8: ...oltage at all poles before opening the device CAUTION If control voltage is applied or a speed setpoint is stored the motor automatically restarts e g after a power failure Danger of injury Keep out of the danger zone of the device When working on the device switch off the mains supply voltage and secure the latter from being switched on again Wait until the device stops After working on the devic...

Page 9: ...easure Check the protective casing against accidental contact for damage and to ensure that it is intact Visual inspection At least every 6 months Repair or replacement of the device Check the device for damage to blades and housing Visual inspection At least every 6 months Replacement of the device Mounting the connection lines Visual inspection At least every 6 months Fasten Check the insulation...

Reviews: