ebm-papst S6E710-AR03-01 Operating Instructions Manual Download Page 9

Operating instructions

S6E710-AR03-01

Translation of the original operating instructions

4.4 Connection diagram

L

= U1 = blue

Z

brown

N

= U2 = black

PE

green/yellow

TOP

gray

Item no. 10160-5-9970 · ENU · Change 98149 · Approved 2018-07-24 · Page 9 / 12

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for S6E710-AR03-01

Page 1: ...authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic...

Page 2: ...step on the guard grill or subject the guard grill to load Do not place any objects on the guard grill There must be sufficient space around the fan to be able to get past the fan 1 6 Mechanical move...

Page 3: ...hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan...

Page 4: ...ns in mm 1 Direction of air flow V 2 Tightening torque 1 5 0 2 Nm 3 Cable diameter min 6 mm max 12 mm tightening torque 2 0 3 Nm Item no 10160 5 9970 ENU Change 98149 Approved 2018 07 24 Page 4 12 ebm...

Page 5: ...eclaration Specific ratio 1 pfs 100 000 Pa Data obtained at optimum efficiency level The ErP data is determined using a motor impeller combination in a standardized measurement setup 3 4 Technical des...

Page 6: ...gether to remove the device from its packaging CAUTION The blades of the impeller could be damaged Carefully set down the fan on a soft surface Make sure the blades are not subjected to load Following...

Page 7: ...ccording to EN 61800 5 1 Compliance with the resistance specifications according to EN 61800 5 1 for the protective earth connection circuit must be verified in the end application Depending on the in...

Page 8: ...e cable is routed in a U shaped loop Fig 2 Fan installed lying flat cable routed in a U shaped loop Fans installed upright When routing the cable make sure that the cable glands are located at the bot...

Page 9: ...4 4 Connection diagram L U1 blue Z brown N U2 black PE green yellow TOP gray Item no 10160 5 9970 ENU Change 98149 Approved 2018 07 24 Page 9 12 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mul...

Page 10: ...tire speed control range Severe vibration can arise for instance from inexpert handling transportation damage and resultant imbalance or be caused by component or structural resonance Speed ranges wit...

Page 11: ...e Abnormal bearing noise acoustic At least every 6 months Replace device 5 3 Disposal For ebm papst environmental protection and resource preservation are top priority corporate goals ebm papst operat...

Page 12: ...The materials concerned are as follows Miscellaneous insulators used in the terminal box Power cables Cables for internal wiring Electrolytic capacitors Dispose of electronic components employing the...

Reviews: