Malfunction/fault

Possible cause

Possible remedy

Impeller not
running smoothly

Imbalance in rotating
parts

Clean the device;
replace it if imbalance
persists after cleaning.
Make sure no
weight clips are
removed during
cleaning.

Motor not turning

Mechanical blockage

Switch off, isolate
from supply and
remove mechanical
blockage.

Line voltage faulty

Check line voltage,
restore power supply.

Faulty connection

Isolate from supply,
correct connection;
see connection
diagram.

Thermal overload
protector activated

Allow motor to cool
off, locate and rectify
cause of error,
release restart lockout
if necessary

Impermissible point of
operation

Check point of
operation

Motor
overtemperature

Ambient temperature
too high

Reduce ambient
temperature if possible

Deficient cooling

Improve cooling

In the event of further malfunctions, contact ebm-papst.

5.1 Cleaning

To ensure a long service life, check the fans regularly for proper
operation and soiling. The frequency of checking is to be adapted
accordingly depending on the degree of soiling.

DANGER
Risk of injury from rotating fan.

→ Only clean when not in motion. Interrupt the power supply,

secure against renewed switch-on. Secure against start-up,
prevent air flow.

;

Dirt deposits on the motor housing can cause overheating of the motor.

;

Soiling of the impeller can cause vibration that will shorten the service
life of the fan.

;

Severe vibration can destroy the fan.

;

In such cases, switch off the fan immediately and clean it.

;

The preferred method of cleaning is dry cleaning, e.g. using
compressed air.

;

Do not use aggressive cleaning agents!

NOTE
Damage to the device during cleaning

Malfunction possible
→ Do not clean the device using a water jet or high-pressure

cleaner.

→ Do not use any acid, alkali or solvent-basedcleaning

agents.

→ Do not use any pointed or sharp-edged objects for cleaning

;

Completely remove any cleaning agents used.

;

If severe corrosion is visible on load-bearing or rotating parts, switch
off the device immediately and replace it.

;

Repair of load-bearing or rotating parts is not permitted!

;

Operate the fan for 2 hours at maximum speed so that any water that
has ingressed can evaporate.

;

If cleaning does not eliminate vibrations, the fan may need to be
rebalanced. To have it rebalanced, contact ebm-papst.

;

The fan is equipped with maintenance-free ball bearings. The lifetime
lubrication of the ball bearings is designed for a service life of 40,000
hours.

;

If bearing replacement is necessary after that period, contact ebm-
papst.

;

Adapt the maintenance intervals to the actual level of dust exposure.

5.2 Safety inspection

What to check

How to check

How often

What action?

Contact
protection
cover for
intactness or
damage

Visual inspection At least every

6 months

Repair or
replacement of
device

Device for
damage to
blades and
housing

Visual inspection At least every

6 months

Replacement of
device

Fastening the
cables

Visual inspection At least every

6 months

Fasten

Fastening the
protective earth
terminal

Visual inspection At least every

6 months

Fasten

Insulation of
cables for
damage

Visual inspection At least every

6 months

Replace cables

Tightness of
cable gland

Visual inspection At least every

6 months

Retighten,
replace if
damaged

Condensation
drainage holes
for clogging,
where necessary

Visual inspection At least every

6 months

Open holes

Welds for crack
formation

Visual inspection At least every

6 months

Replace device

Abnormal
bearing noise

acoustic

At least every
6 months

Replace device

5.3 Disposal

For ebm-papst, environmental protection and resource preservation are
top priority corporate goals.
ebm-papst operates an environmental management system which is
certified in accordance with ISO 14001 and rigorously implemented
around the world on the basis of German standards.
Right from the development stage, ecological design, technical safety
and health protection are fixed criteria.
The following section contains recommendations for ecological disposal
of the product and its components.

Item no. 10081-5-9970 · ENU · Change 217294 · Approved 2020-07-16 · Page 11 / 12

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for S4E500-AM03-01

Page 1: ...authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic...

Page 2: ...grill There must be sufficient space around the fan to be able to get past the fan 1 6 Mechanical movement DANGER Rotating device Risk of injury to body parts coming into contact with the rotor or the...

Page 3: ...hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan...

Page 4: ...in mm 1 Direction of air flow V 2 Tightening torque 0 8 0 15 Nm 3 Cable diameter min 6 mm max 12 mm tightening torque 2 0 0 3 Nm Item no 10081 5 9970 ENU Change 217294 Approved 2020 07 16 Page 4 12 e...

Page 5: ...tion Specific ratio 1 pfs 100 000 Pa Data obtained at optimum efficiency level The ErP data is determined using a motor impeller combination in a standardized measurement setup 3 4 Technical descripti...

Page 6: ...ether to remove the device from its packaging CAUTION The blades of the impeller could be damaged Carefully set down the fan on a soft surface Make sure the blades are not subjected to load Following...

Page 7: ...ications according to EN 61800 5 1 for the protective earth connection circuit must be verified in the end application Depending on the installation situation it may be necessary to connect an additio...

Page 8: ...cable is routed in a U shaped loop Fig 2 Fan installed lying flat cable routed in a U shaped loop Fans installed upright When routing the cable make sure that the cable glands are located at the bott...

Page 9: ...4 4 Connection diagram L U1 blue Z brown N U2 black PE green yellow TOP gray Item no 10081 5 9970 ENU Change 217294 Approved 2020 07 16 Page 9 12 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mu...

Page 10: ...nt imbalance or be caused by component or structural resonance Speed ranges with excessively high vibration levels and possibly resonant frequencies must be determined in the course of fan commissioni...

Page 11: ...the device immediately and replace it Repair of load bearing or rotating parts is not permitted Operate the fan for 2 hours at maximum speed so that any water that has ingressed can evaporate If clean...

Page 12: ...tallic materials are generally considered to be fully recyclable Separate the components for recycling into the following categories Steel and iron Aluminum Non ferrous metal e g motor windings Plasti...

Reviews: