ebm-papst S4E350-ZD02-01 Operating Instructions Manual Download Page 7

Operating instructions

S4E350-ZD02-01

Translation of the original operating instructions

3.5 Mounting data

Any further mounting data required can be taken from the product
drawing or Section Chapter 4.1 Mechanical connection.

Strength class of
screws

8.8

;

Secure the screws against unintentional loosening (e.g. use self-
locking screws).

3.6 Transport and storage conditions

Max. permitted
ambient temp. for
motor (transport/
storage)

+ 80 °C

Min. permitted
ambient temp. for
motor (transport/
storage)

- 40 °C

4. CONNECTION AND STARTUP

4.1 Mechanical connection

CAUTION
Cutting and crushing hazard when removing fan from
packaging

→ Carefully remove the device from its packaging, by the

guard grille. Strictly avoid shocks.

→ Wear safety shoes and cut-resistant safety gloves.

NOTE
Damage to the device from vibration

Bearing damage, shorter service life
→ The fan must not be subjected to force or excessive vibration

from sections of the installation.

→ If the fan is connected to air ducts, the connection should

be isolated from vibration, e.g. using compensators or similar
elements.

→ Ensure stress-free attachment of the fan to the

substructure.

;

Check the device for transport damage. Damaged devices are not to
be installed.

;

Install the undamaged device in accordance with your application.

NOTE
Motor capacitor

→ The product is equipped with a motor capacitor with safety

protection class P0/S0 according to EN 60252-1. Take this
into consideration when fitting it to the end product on the
basis of applicable regulations.

CAUTION
Possible damage to the device

If the device slips during installation, serious damage can result.
→ Ensure that the device is securely positioned at its place of

installation until all fastening screws have been tightened.

The fan must not be strained on fastening.

4.2 Electrical connection

DANGER
Voltage on the device

Electric shock
→ Always connect a protective earth first.
→ Check the protective earth.

DANGER
Faulty insulation

Risk of fatal injury from electric shock
→ Use only cables that meet the specified installation

regulations for voltage, current, insulation material, capacity,
etc.

→ Route cables so that they cannot be touched by any

rotating parts.

DANGER
Electrical charge (>50 µC) between phase conductor and
protective earth connection after switching off supply
with multiple devices connected in parallel.

Electric shock, risk of injury
→ Ensure sufficient protection against accidental contact.

Before working on the electrical hookup, short the supply
and PE connections.

CAUTION
Voltage

The fan is a built-in component and has no disconnecting switch.
→ Only connect the fan to circuits that can be switched off with

an all-pole disconnection switch.

→ When working on the fan, secure the system/machine in

which the fan is installed so as to prevent it from being
switched back on.

NOTE
Water ingress into wires or cables

Water ingress at the customer end of the cable can damage the
device.
→ Make sure the end of the cable is connected in a dry

environment.

Only connect the device to circuits that can be switched off with
an all-pole disconnection switch.

4.2.1 Requirements

;

Check whether the information on the nameplate matches the
connection data.

;

If the motor run capacitor was not installed by ebm-papst, check
whether the information on the motor run capacitor matches the
information on the nameplate.

;

Before connecting the device, make sure the power supply matches
the device voltage.

;

Only use cables designed for the current level indicated on the
nameplate.
For determining the cross-section, note the sizing criteria according
to EN 61800-5-1. The protective earth must have a cross-section
equal to or greater than that of the phase conductor.
We recommend the use of 105 °C cables. Ensure that the minimum
cable cross-section is at least
AWG 26 / 0.13 mm².

Item no. 17008-5-9970 · ENU · Change 225416 · Approved 2020-12-14 · Page 7 / 13

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for S4E350-ZD02-01

Page 1: ...ical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules The safety hazards associated with the device must be assessed again following installation in the final product The locally applicable industrial safety regulations are always to be observed when worki...

Page 2: ...ant 1 7 Mechanical movement DANGER Rotating device Risk of injury to body parts coming into contact with the rotor or the impeller Secure the device against accidental contact Before working on the system machine wait until all parts have come to a standstill WARNING Rotating device Long hair and dangling items of clothing jewelry and the like can become entangled and be pulled into the device Inj...

Page 3: ... unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan from the customer installation Operation in medical equipment with a life sustaining or life support function Conveying solids in the flow medium Painting the device Connections e g screws coming loose during operation Opening the termin...

Page 4: ... Tightening torque 1 5 0 2 Nm 3 Cable diameter max 7 5 mm tightening torque 1 3 0 2 Nm 4 Accessory part Inlet ring 35100 2 4013 not included in scope of delivery Item no 17008 5 9970 ENU Change 225416 Approved 2020 12 14 Page 4 13 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 0 7938 81 0 Fax 49 0 7938 81 110 info1 de ebmpapst com www ebmpapst com ...

Page 5: ...ting instructions All dimensions in mm Inlet ring 35100 2 4013 Item no 17008 5 9970 ENU Change 225416 Approved 2020 12 14 Page 5 13 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 0 7938 81 0 Fax 49 0 7938 81 110 info1 de ebmpapst com www ebmpapst com ...

Page 6: ...PP plastic Impeller material PP plastic galvanized sheet metal plate Guard grille material Steel coated with black plastic RAL 9005 Number of blades 5 Airflow direction V Direction of rotation Clockwise viewed toward rotor Degree of protection IP44 installation and position dependent as per EN 60034 5 Insulation class F Moisture F Environmental H protection class H1 Installation position Shaft hor...

Page 7: ...protective earth DANGER Faulty insulation Risk of fatal injury from electric shock Use only cables that meet the specified installation regulations for voltage current insulation material capacity etc Route cables so that they cannot be touched by any rotating parts DANGER Electrical charge 50 µC between phase conductor and protective earth connection after switching off supply with multiple devic...

Page 8: ...l box 4 3 1 Preparing cables for connection Only strip the cable as far as necessary ensuring that the cable gland is sealed and there is no strain on the connections For tightening torques see Chapter 3 1 Product drawing NOTE Tightness and strain relief are dependent on the cable used This must be checked by the user 4 3 2 Connecting wires to terminals Remove the cap from the cable gland Only rem...

Page 9: ...ing instructions Fig 3 Cable routing for fans installed upright Item no 17008 5 9970 ENU Change 225416 Approved 2020 12 14 Page 9 13 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 0 7938 81 0 Fax 49 0 7938 81 110 info1 de ebmpapst com www ebmpapst com ...

Page 10: ...tions 4 4 Connection diagram L U1 blue Z brown N U2 black PE green yellow Item no 17008 5 9970 ENU Change 225416 Approved 2020 12 14 Page 10 13 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 0 7938 81 0 Fax 49 0 7938 81 110 info1 de ebmpapst com www ebmpapst com ...

Page 11: ...ntire speed control range Severe vibration can arise for instance from inexpert handling transportation damage and resultant imbalance or be caused by component or structural resonance Speed ranges with excessively high vibration levels and possibly resonant frequencies must be determined in the course of fan commissioning Either run through the resonant range as quickly as possible with speed con...

Page 12: ...for 2 hours at maximum speed so that any water that has ingressed can evaporate If cleaning does not eliminate vibrations the fan may need to be rebalanced To have it rebalanced contact ebm papst The fan is equipped with maintenance free ball bearings The lifetime lubrication of the ball bearings is designed for a service life of 40 000 hours If bearing replacement is necessary after that period c...

Page 13: ...etallic materials are generally considered to be fully recyclable Separate the components for recycling into the following categories Steel and iron Aluminum Non ferrous metal e g motor windings Plastics particularly with brominated flame retardants in accordance with marking Insulating materials Cables and wires Electronic scrap e g circuit boards Only ferrite magnets and not rare earth magnets a...

Reviews: