background image

Operating instructions

R2E280-AF07-09

Translation of the original operating instructions

3. TECHNICAL DATA

3.1 Product drawing

All dimensions in mm.

1

Cable silicone 4 x 0.5 mm², 4 x crimped splices

2

Accessory part: inlet ring 96360-2-4013 not included in scope of delivery

3

Max. clearance for screw 6 mm

Item no. 11095-5-9970 · ENU · Change 202174 · Approved 2019-01-03 · Page 4 / 11

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for R2E280-AF07-09

Page 1: ...d by suitably qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installatio...

Page 2: ...ng installation appropriate shielding measures have to be taken by the user NOTE Electrical or electromagnetic interference after installing the device in customer equipment Verify that the entire set...

Page 3: ...ing the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan from the customer...

Page 4: ...ilicone 4 x 0 5 mm 4 x crimped splices 2 Accessory part inlet ring 96360 2 4013 not included in scope of delivery 3 Max clearance for screw 6 mm Item no 11095 5 9970 ENU Change 202174 Approved 2019 01...

Page 5: ...EN 60335 1 Approval EAC With regard to cyclic speed loads note that the rotating parts of the device are designed for a maximum of one million load cycles If you have special questions consult ebm pa...

Page 6: ...the fan to circuits that can be switched off with an all pole disconnection switch When working on the fan secure the system machine in which the fan is installed so as to prevent it from being switch...

Page 7: ...pter 4 4 Connection diagram 4 3 1 Motor protection CAUTION Voltage The device is a built in component and has no disconnecting switch Connect the device to a suitable tripping unit Only connect the de...

Page 8: ...4 4 Connection diagram TOP 2x gray U1 blue Z brown U2 black PE green yellow Item no 11095 5 9970 ENU Change 202174 Approved 2019 01 03 Page 8 11 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mul...

Page 9: ...ENANCE MALFUNCTIONS POSSIBLE CAUSES AND REMEDIES Do not perform any repairs on your device Send the device to ebm papst for repair or replacement WARNING Live terminals and connections even with devic...

Page 10: ...ety and health protection are fixed criteria The following section contains recommendations for ecological disposal of the product and its components 5 3 1 Country specific legal requirements NOTE Cou...

Page 11: ...ploying the proper procedures for electronic scrap Please contact ebm papst for any other questions on disposal Item no 11095 5 9970 ENU Change 202174 Approved 2019 01 03 Page 11 11 ebm papst Mulfinge...

Reviews: