background image

Operating instructions

R2E225-BD92-58

Translation of the original operating instructions

3. TECHNICAL DATA

3.1 Product drawing

All dimensions in mm.

1

Accessory part: inlet ring 96358-2-4013 not included in scope of delivery

2

Max. clearance for screw 5 mm

3

Cable PFA AWG20, 4x crimped splices

Item no. 15486-5-9970 · ENU · Change 226349 · Approved 2021-03-22 · Page 4 / 11

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for R2E225-BD92-58

Page 1: ...and otherwise used by suitably qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the elect...

Page 2: ...efore working on the system machine wait until all parts have come to a standstill WARNING Rotating device Long hair and dangling items of clothing jewelry and the like can become entangled and be pul...

Page 3: ...d be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the...

Page 4: ...ccessory part inlet ring 96358 2 4013 not included in scope of delivery 2 Max clearance for screw 5 mm 3 Cable PFA AWG20 4x crimped splices Item no 15486 5 9970 ENU Change 226349 Approved 2021 03 22 P...

Page 5: ...Economic Area Approval CSA C22 2 No 100 UL 1004 1 With regard to cyclic speed loads note that the rotating parts of the device are designed for a maximum of one million load cycles If you have specia...

Page 6: ...formation on the nameplate matches the connection data If the motor run capacitor was not installed by ebm papst check whether the information on the motor run capacitor matches the information on the...

Page 7: ...st connect the PE protective earth Connect the cables according to your application When doing so observe Chapter 4 4 Connection diagram Item no 15486 5 9970 ENU Change 226349 Approved 2021 03 22 Page...

Page 8: ...ctions 4 4 Connection diagram U1 blue Z brown U2 black PE green yellow Item no 15486 5 9970 ENU Change 226349 Approved 2021 03 22 Page 8 11 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfingen...

Page 9: ...MAINTENANCE MALFUNCTIONS POSSIBLE CAUSES AND REMEDIES Do not perform any repairs on your device Send the device to ebm papst for repair or replacement WARNING Live terminals and connections even with...

Page 10: ...astening the protective earth terminal Visual inspection At least every 6 months Fasten Insulation of cables for damage Visual inspection At least every 6 months Replace cables Impeller for wear depos...

Page 11: ...ires are made of similar materials and are therefore to be treated in the same manner The materials concerned are as follows Miscellaneous insulators used in the terminal box Power cables Cables for i...

Reviews: