background image

Operating instructions

R2E220-RA38-13

Translation of the original operating instructions

3. TECHNICAL DATA

3.1 Product drawing

All dimensions in mm.

1

Accessory part: Inlet ring 09609-2-4013, not included in scope of delivery

2

Max. clearance for screw 5 mm

3

Cable PFA AWG20, 4x crimped splices

Item no. 14474-5-9970 · ENU · Change 89188 · Approved 2016-08-26 · Page 4 / 9

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for R2E220-RA38-13

Page 1: ...only be transported unpacked installed operated maintained and otherwise used by suitably qualified trained and authorized technical staff Only authorized specialists are permitted to install the dev...

Page 2: ...e system machine wait until all parts have come to a standstill WARNING Rotating device Long hair and dangling items of clothing jewelry and the like can become entangled and be pulled into the device...

Page 3: ...rticular operating the device in the following ways is prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operat...

Page 4: ...Accessory part Inlet ring 09609 2 4013 not included in scope of delivery 2 Max clearance for screw 5 mm 3 Cable PFA AWG20 4x crimped splices Item no 14474 5 9970 ENU Change 89188 Approved 2016 08 26 P...

Page 5: ...you have special questions consult ebm papst for support 3 4 Mounting data For screw clearance see Chapter 3 1 Product drawing Secure the screws against unintentional loosening e g use self locking s...

Page 6: ...ross section equal to or greater than that of the phase conductor We recommend the use of 105 C cables Ensure that the minimum cable cross section is at least AWG 26 0 13 mm Protective earth contact r...

Page 7: ...uctions 4 4 Connection diagram U1 blue Z brown U2 black PE green yellow Item no 14474 5 9970 ENU Change 89188 Approved 2016 08 26 Page 7 9 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfingen...

Page 8: ...MAINTENANCE MALFUNCTIONS POSSIBLE CAUSES AND REMEDIES Do not perform any repairs on your device Send the device to ebm papst for repair or replacement WARNING Live terminals and connections even with...

Page 9: ...regulations with regard to the disposal of products or waste occurring in the various phases of the life cycle The corresponding disposal standards are also to be heeded 5 3 2 Disassembly Disassembly...

Reviews: