background image

Operating instructions

R2E190-AO26-30

Translation of the original operating instructions

4.3 Plug connection

4.3.1 Preparing cables for connection

The cables, including the customer interface, are subject to the
specifications for internal wiring.
Ensure conformity with applicable standards and check the
degree of protection in the final product after installing the ebm-
papst device.

;

Connect the cables to the mating connectors.

4.3.2 Making supply connections

;

Check your connector's pin assignment.

;

Connect the built-in connector with the mating connector.

;

Ensure that the connector is properly engaged.

Item no. 11066-5-9970 · ENU · Change 202174 · Approved 2019-01-03 · Page 8 / 11

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for R2E190-AO26-30

Page 1: ...and otherwise used by suitably qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the elec...

Page 2: ...coming into contact with the rotor or the impeller Secure the device against accidental contact Before working on the system machine wait until all parts have come to a standstill WARNING Rotating dev...

Page 3: ...ing the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan from the customer...

Page 4: ...PVC AWG20 with 3 x plug pin Molex 02 06 2201 1 1 brown 1 2 black 1 3 blue 2 Accessory part Inlet ring 09576 2 4013 not included in scope of delivery 3 Max clearance for screw 5 mm Item no 11066 5 9970...

Page 5: ...sions in mm 1 Accessory part inlet ring 09576 2 4013 not included in scope of delivery Item no 11066 5 9970 ENU Change 202174 Approved 2019 01 03 Page 5 11 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D...

Page 6: ...rds EN 60034 1 EN 60204 1 CE Approval CSA C22 2 No 77 CCC UL 1004 3 With regard to cyclic speed loads note that the rotating parts of the device are designed for a maximum of one million load cycles I...

Page 7: ...ction switch 4 2 1 Requirements Check whether the information on the nameplate matches the connection data If the motor run capacitor was not installed by ebm papst check whether the information on th...

Page 8: ...gree of protection in the final product after installing the ebm papst device Connect the cables to the mating connectors 4 3 2 Making supply connections Check your connector s pin assignment Connect...

Page 9: ...ctions 4 4 Connection diagram U1 blue Z brown U2 black PE green yellow Item no 11066 5 9970 ENU Change 202174 Approved 2019 01 03 Page 9 11 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfingen...

Page 10: ...POSSIBLE CAUSES AND REMEDIES Do not perform any repairs on your device Send the device to ebm papst for repair or replacement WARNING Live terminals and connections even with device switched off Elect...

Page 11: ...ntry specific legal regulations with regard to the disposal of products or waste occurring in the various phases of the life cycle The corresponding disposal standards are also to be heeded 5 3 2 Disa...

Reviews: