ebm-papst R2E108-AG63-05 Operating Instructions Manual Download Page 8

Operating instructions

R2E108-AG63-05

Translation of the original operating instructions

4.3 Connecting the cables

The device has external leads.

;

First connect the "PE" (protective earth).

Connect the cables according to your application. When doing so,
observe Chapter 4.4 Connection diagram.

Item no. 12085-5-9970 · ENU · Change 202174 · Approved 2019-02-05 · Page 8 / 12

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for R2E108-AG63-05

Page 1: ...d otherwise used by suitably qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electri...

Page 2: ...coming into contact with the rotor or the impeller Secure the device against accidental contact Before working on the system machine wait until all parts have come to a standstill WARNING Rotating dev...

Page 3: ...ing the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan from the customer...

Page 4: ...m 1 Accessory part Inlet ring 09566 2 4013 not included in scope of delivery 2 Screw in depth max 5mm 3 Cable PVC 4G 0 5 mm 4x splice Item no 12085 5 9970 ENU Change 202174 Approved 2019 02 05 Page 4...

Page 5: ...sions in mm 1 Accessory part inlet ring 09566 2 4013 not included in scope of delivery Item no 12085 5 9970 ENU Change 202174 Approved 2019 02 05 Page 5 12 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D...

Page 6: ...speed loads note that the rotating parts of the device are designed for a maximum of one million load cycles If you have special questions consult ebm papst for support Use the device in accordance w...

Page 7: ...e disconnection switch 4 2 1 Requirements Check whether the information on the nameplate matches the connection data If the motor run capacitor was not installed by ebm papst check whether the informa...

Page 8: ...st connect the PE protective earth Connect the cables according to your application When doing so observe Chapter 4 4 Connection diagram Item no 12085 5 9970 ENU Change 202174 Approved 2019 02 05 Page...

Page 9: ...ctions 4 4 Connection diagram U1 blue Z brown U2 black PE green yellow Item no 12085 5 9970 ENU Change 202174 Approved 2019 02 05 Page 9 12 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfingen...

Page 10: ...your device Send the device to ebm papst for repair or replacement WARNING Live terminals and connections even with device switched off Electric shock Wait five minutes after disconnecting the voltage...

Page 11: ...evel of dust exposure 5 2 Safety inspection What to check How to check How often What action Contact protection cover for intactness or damage Visual inspection At least every 6 months Repair or repla...

Page 12: ...xternal rotor motors from ebm papst Mulfingen GmbH Co KG Ferrite magnets can be disposed of in the same way as normal iron and steel Electrical insulating materials on the product in cables and wires...

Reviews: