ebm-papst R1G085-AB05-01 Operating Instructions Manual Download Page 4

Operating instructions

R1G085-AB05-01

Translation of the original operating instructions

3. TECHNICAL DATA

3.1 Product drawing

All dimensions in mm.

1

Max. clearance for screw 5 mm

2

Cable PVC AWG22, 4x crimped splices

Item no. 54317-5-9970 · ENU · Change 91499 · Approved 2016-11-09 · Page 4 / 9

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for R1G085-AB05-01

Page 1: ...ied trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety r...

Page 2: ...y parts coming into contact with the rotor or the impeller Secure the device against accidental contact Before working on the system machine wait until all parts have come to a standstill WARNING Rota...

Page 3: ...mproper use In particular operating the device in the following ways is prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant...

Page 4: ...oduct drawing All dimensions in mm 1 Max clearance for screw 5 mm 2 Cable PVC AWG22 4x crimped splices Item no 54317 5 9970 ENU Change 91499 Approved 2016 11 09 Page 4 9 ebm papst Mulfingen GmbH Co KG...

Page 5: ...or a maximum of one million load cycles If you have special questions consult ebm papst for support Use the device in accordance with its degree of protection Information on surface quality The surfac...

Page 6: ...and has no disconnecting switch Only connect the fan to circuits that can be switched off with an all pole disconnection switch When working on the fan secure the system machine in which the fan is in...

Page 7: ...ating instructions 4 4 Connection diagram Drawing preliminary Item no 54317 5 9970 ENU Change 91499 Approved 2016 11 09 Page 7 9 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfingen Phone 49 0...

Page 8: ...switch the motor e g in cyclic operation on and off via power supply Disconnect the device from the power supply 5 MAINTENANCE MALFUNCTIONS POSSIBLE CAUSES AND REMEDIES Do not perform any repairs on y...

Page 9: ...f products or waste occurring in the various phases of the life cycle The corresponding disposal standards are also to be heeded 5 3 2 Disassembly Disassembly of the product must be performed or super...

Reviews: