background image

Nova Flair GmbH & Co. KG, Operating Instructions with EU Declaration of Conformity Dust Extraction Unit Taifun II Premium GreenTech

8

INSTALLATION INSTRUCTIONS AND INSTRUCTIONS

 

FOR USE

Instruction Manual Taifun II Premium GreenTech

Function

The nail dust collector is switched on and off via the 

green push button.

The speed control is used for stepless adjustment of 
the power. of the power.

Cleaning

Use the hand screws (knurled screws) to loosen the 

removable front panel and carefully pull out the acti-

vated charcoal lamella filter slowly using a loop. 

For this purpose, it is best to use our additionally 

available dust collection tray. 

The activated charcoal lamella filters should be taken 

out and cleaned about 2 2-4 times per month. The 

remaining coarse dust is simply removed by pulling 

out the large dust collection tray (optionally available) 

and disposed of. If there is no dust collection tray, the 

dust must be sucked out from the inside through the 

large filter openings with a hoover and a narrow cre

-

vice nozzle attachment or similar.

Also clean or vacuum the lamella filter very carefully 

on the lower side only (not the clean air side at the 

top). Do not treat it wet and replace it after approx. 

one year.

The  replacement  of  the  filters  and  the  frequency  of 

cleaning can vary depending on the effort, care and 

customer volume.

1.  Carefully unpack the nail dust collector 

and first check that the black rubber seals 

on the edges stick properly.

2.  Place the nail dust collector on the under-

side of the table top and adjust it so that 

the cut-out for the ventilation grille is as 

central as possible (see sketch).

3.  Use the jigsaw etc. to make a cut-out in 

the centre with a diameter of Ø 160 mm.

4. 

Now you can fix the nail dust collector with 

suitable screws. (not included in the deli-

very).

 

Please pay attention to the length of 

the screws!

If anything is unclear, please contact us via the communication channels known to you. It will then be explained 

to you again in detail.

Kaitstud / Secured by https://mereneid.eu/

Summary of Contents for NOVA FLAIR TAIFUN II Premium GreenTech

Page 1: ...ation of Conformity According to EC Machinery Directive 2006 42 II B January 2022 for the incomplete machine which incomplete alone is not functional Professional Nail Dust Collector Taifun II Premium GreenTech Kaitstud Secured by https mereneid eu ...

Page 2: ...nstructions for normal operation 2 5 Safe removal of possible blockages 2 6 Notes on special dangers 2 6 1 Electrical energy 2 6 2 Block diagram schematic representation of the system 2 6 3 Noise 2 7 UVV regulations 2 8 Notes on the transport of the unit 2 9 Notes on storage of the unit 2 10 Information on decommissioning dismantling and disposal B Installation instructions and instructions for us...

Page 3: ...e unit Picture no 1 Front and side view of the nail dust collector with main filter elements Picture no 2 Ready to install unit with main filter elements and extraction fans Picture no 3 Front view with main filter elements and dust col lection tray pulled out Picture no 4 Illustration of type plate Taifun II Premium Green Tech example illustration Kaitstud Secured by https mereneid eu ...

Page 4: ...that the filters are regular ly cleaned and dry cleaned according to the operating instructions If cleaning is no longer possible the filters must be replaced with the replacement filters specified by the manufac turer The replaced or clogged filters must be disposed of in accordance with the Closed Sub stance Cycle and Waste Management Act The personnel working on the nail dust collector must hav...

Page 5: ...nly be operated who are mentally and physically fit Make sure that the mains voltage corresponds to the required voltage of 230V The nail dust collector filters must be cleaned or changed regularly according to the manufac turer s instructions Only the filters listed in the operating instruc tions and provided by the manufacturer may be used Appropriate measures must be taken to ensure that the na...

Page 6: ...r must be disconnected from the circuit or de energised by removing the po wer plug from the socket The electrical equipment of the machine must be inspected checked regularly Defects such as loose connections or scorched cables must be rectified immediately A 2 6 2 Block diagram schematic representation of the system A 2 6 3 Noise The machine produces only slight barely perceptible vibrations and...

Page 7: ...collector the filters or the motors from above Before reassembling the unit make sure that there are no foreign bodies in the unit itself or in the filters or motors For reinstallation the installation instructions prescribed on the following page 8 apply A 2 9 Notes on storage of the unit The unit must always be stored in a dry and dust free environment Suitable cardboard packaging should also be...

Page 8: ...dust must be sucked out from the inside through the large filter openings with a hoover and a narrow cre vice nozzle attachment or similar Also clean or vacuum the lamella filter very carefully on the lower side only not the clean air side at the top Do not treat it wet and replace it after approx one year The replacement of the filters and the frequency of cleaning can vary depending on the effor...

Page 9: ...rm an nail dust collector Nova Flair GmbH Co KG System part Type and designations Manufacturer Electrical Connec ted loads 230 V 50 60 Hz 160 W Aluminium housing Housing made of anodised aluminium sheet powder coated dimensi ons W H D approx 85 x 38 x 115 cm Net weight 8 kg Switch button Illuminated single pole ON OFF push button Fuse 2A Inert Weltron Elektronik GmbH Fans 2x Radial blower type R3G...

Page 10: ...the following documents For the product described below Subject of the declaration Professional nail dust collector Type Model Taifun II Premium GreenTech 2006 42 EG Directive 2006 42 EC of the European Parliament and of the Council of 17 May 2006 on machinery and amending Directive 95 16 EC recast 2014 30 EU Directive 2014 30 EU of the European Parliament and of the Council of 26 February 2014 on...

Page 11: ...r equipment with a rated current 16 A per conductor and not subject to a special connection condition The sole responsibility for drawing up this EU declaration of conformity in relation to the fulfilment of the essential requirements and the preparation of the technical documentation shall lie with the manufacturer Additional information 1 This declaration applies to all specimens manufactured in...

Page 12: ...Nova Flair GmbH Co KG An der Ronceva 10 12 32312 Lübbecke Germany January 2022 Kaitstud Secured by https mereneid eu ...

Reviews: