ebm-papst K4E400-AC11-13 Operating Instructions Manual Download Page 8

Operating instructions

K4E400-AC11-13

Translation of the original operating instructions

4.5 Connection diagram

L

black 1

N

black 2

PE

green/yellow

Item no. 15648-5-9970 · ENU · Change 86552 · Approved 2016-08-25 · Page 8 / 10

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for K4E400-AC11-13

Page 1: ...qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic sa...

Page 2: ...n by the user NOTE Electrical or electromagnetic interference after installing the device in customer equipment Verify that the entire setup is EMC compliant 1 7 Mechanical movement DANGER Rotating de...

Page 3: ...nt air pressure between 800 mbar and 1050 mbar Using the device within the permitted ambient temperature range see Chapter 3 5 Transport and storage conditions and Chapter 3 2 Nominal data Operating t...

Page 4: ...duct drawing All dimensions in mm 1 3 pole connector housing Wieland 92 032 9358 1 1 1 L1 1 2 PE 1 3 N Item no 15648 5 9970 ENU Change 86552 Approved 2016 08 25 Page 4 10 ebm papst Mulfingen GmbH Co K...

Page 5: ...in safety protection class S0 Conformity with standards EN 60335 1 With regard to cyclic speed loads note that the rotating parts of the device are designed for a maximum of one million load cycles I...

Page 6: ...ply with multiple devices connected in parallel Electric shock risk of injury Ensure sufficient protection against accidental contact Before working on the electrical hookup short the supply and PE co...

Page 7: ...t be checked in the application by the customer 4 3 Plug connection 4 3 1 Making supply connections Check your connector s pin assignment Connect the built in connector with the mating connector Ensur...

Page 8: ...tructions 4 5 Connection diagram L black 1 N black 2 PE green yellow Item no 15648 5 9970 ENU Change 86552 Approved 2016 08 25 Page 8 10 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfingen Ph...

Page 9: ...t the device from the power supply at the supply line s main switch When disconnecting be sure to disconnect the ground connection last 5 MAINTENANCE MALFUNCTIONS POSSIBLE CAUSES AND REMEDIES Do not p...

Page 10: ...requirements Always observe the applicable country specific legal regulations with regard to the disposal of products or waste occurring in the various phases of the life cycle The corresponding disp...

Reviews: