4.3 Connecting the cables

The device has external leads.

;

First connect the "PE" (protective earth).

Connect the cables according to your application. When doing so,
observe Chapter 4.5 Connection diagram.

4.4 Factory settings

Factory settings made for the device by ebm-papst.

Mode parameter set 1

PWM control

Mode parameter set 2

PWM control

Fan/device address

01

Max. PWM / %

100

Min. PWM / %

5

Save set value to
EEPROM

Yes

Set value requirement

Analog (linear)

Direction of action
parameter set 1

Positive (heating)

Direction of action
parameter set 2

Positive (heating)

Item no. 52546-5-9970 · ENU · Change 212422 · Approved 2020-07-14 · Page 8 / 13

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for K3G400-RJ75-01

Page 1: ...are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules The safety hazards associated with the de...

Page 2: ...ore working on the system machine wait until all parts have come to a standstill DANGER Ejected parts Missing protective devices may cause balancing weights or broken fan blades to be ejected and caus...

Page 3: ...2 Nominal data Operating the device with all protective devices Following the operating instructions Improper use In particular operating the device in the following ways is prohibited and could be h...

Page 4: ...install support struts only vertically as illustrated or rotor on bottom rotor on top on request 2 Cable PVC AWG18 6x crimped ferrules 3 Cable PVC AWG22 5x crimped ferrules Item no 52546 5 9970 ENU C...

Page 5: ...using a motor impeller combination in a standardized measurement setup 3 4 Technical description Weight 16 5 kg Size 400 mm Motor size 112 Rotor surface Painted black Electronics housing material Die...

Page 6: ...blic power grid is greater than or equal to 250 times the rated output of the arrangement It is the responsibility of the installation engineer or operator owner of the device to ensure if necessary a...

Page 7: ...necessary to connect an additional protective earth conductor by way of the extra protective earth terminal provided on the device The protective earth terminal is located on the housing and provided...

Page 8: ...ade for the device by ebm papst Mode parameter set 1 PWM control Mode parameter set 2 PWM control Fan device address 01 Max PWM 100 Min PWM 5 Save set value to EEPROM Yes Set value requirement Analog...

Page 9: ...g 250 VAC 2 A AC1 min 10 mA reinforced insulation on supply side and basic insulation on control interface side 2 8 0 10V yellow Analog input set value 0 10 V Ri 100 k adjustable curve SELV 2 10 RSB b...

Page 10: ...issible vibration severity must not exceed 3 5 mm s and should be checked at intervals of 6 months It is to be determined at the motor mount at the motor support plate at least in axial direction and...

Page 11: ...eck line voltage restore power supply Attention The error message resets automatically Device restarts automatically without warning Faulty connection Isolate from supply correct connection see connec...

Page 12: ...after that period contact ebm papst Adapt the maintenance intervals to the actual level of dust exposure 6 3 Safety inspection NOTE High voltage test The integrated EMC filter has Y capacitors The tr...

Page 13: ...tallic materials are generally considered to be fully recyclable Separate the components for recycling into the following categories Steel and iron Aluminum Non ferrous metal e g motor windings Plasti...

Reviews: