background image

Operating instructions

K3G400-AQ27-K1

Translation of the original operating instructions

4.3 Connection in terminal box

4.3.1 Preparing cables for connection

Only strip the cable as far as necessary, ensuring that the cable gland is
sealed and there is no strain on the connections. For tightening torques,
see Chapter 3.1 Product drawing.

NOTE
Tightness and strain relief are dependent on the cable
used.

→ This must be checked by the user.

Fig. 1: Recommended stripped lengths in mm (inside terminal box)
Legend: CL = control lines

4.3.2 Connecting wires to terminals

WARNING
Live terminals and connections even with device
switched off

Electric shock
→ Wait five minutes after disconnecting the voltage at all poles

before opening the device.

;

Remove the cap from the cable gland.

Only remove caps where cables are fed in.

;

Equip the cable glands with the seals provided in the terminal box.

;

Route the wire(s) (not included in scope of delivery) into the terminal
box.

;

First connect the "PE" (protective earth).

;

Connect the wires to the corresponding terminals.

Use a screwdriver to do so.
When connecting, ensure that no wire ends fan out.

Fig. 2: Connecting wires to terminals

;

Seal the terminal box.

4.3.3 Cable routing

Water must be prevented from reaching the cable gland along the cable.

NOTE
Damage caused by moisture penetration.

Moisture can penetrate into the terminal box if water is
constantly present at the cable glands.
→ To prevent the constant accumulation of water at the cable

glands, the cable should be routed in a U-shaped loop
wherever possible.

→ If this is not possible, a drip edge can be produced by

fitting a cable tie directly in front of the cable gland for example.

4.4 Factory settings

Factory settings made for the device by ebm-papst.

Mode parameter set 1

PWM control

Mode parameter set 2

PWM control

Fan/device address

1

Max. PWM / %

100

Min. PWM / %

5,1

Save set value to
EEPROM

Yes

Set value requirement

Analog (linear)

Direction of action
parameter set 1

Positive (heating)

Direction of action
parameter set 2

Positive (heating)

Item no. 57107-5-9970 · ENU · Change 230627 · Approved 2022-01-13 · Page 8 / 13

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for K3G400-AQ27-K1

Page 1: ...re permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules The safety hazards associated with the device must be assessed again following installation in the final product The locally applicable industrial safety regulations are always to be observed when working on the device Keep the workplace clea...

Page 2: ...fore working on the system machine wait until all parts have come to a standstill DANGER Ejected parts Missing protective devices may cause balancing weights or broken fan blades to be ejected and cause injuries Take appropriate safety measures WARNING Rotating device Long hair and dangling items of clothing jewelry and the like can become entangled and be pulled into the device Injuries can resul...

Page 3: ...3 6 Transport and storage conditions and Chapter 3 2 Nominal data Operating the device with all protective devices Following the operating instructions Improper use In particular operating the device in the following ways is prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This...

Page 4: ...ax 12 mm tightening torque 1 8 0 3 Nm 4 1 NC 4 2 COM 4 3 10 V 4 4 0 10 V 4 5 GND 4 6 RSA 4 7 RSB 5 Tightening torque 3 0 5 Nm 6 Customer ventilation port DN 100 7 Tightening torque 3 5 0 5 Nm 8 Inlet ring with pressure tap k factor 188 9 Spiral hose dia 80 mm PVC coated polyester fabric self extinguishing 10 Remove caps prior to start up When cleaning put the cap on again to prevent the cleaning m...

Page 5: ...papst If other air conduction geometries are used on the installation side the ebm papst evaluation loses its validity the conformity must be confirmed again The product does not fall within the scope of Regulation EU 2019 1781 due to the exception specified in Article 2 2a motors completely integrated into a product 3 4 Technical description Weight 44 kg Size 400 mm Motor size 150 Impeller materi...

Page 6: ...al to 250 times the rated output of the arrangement It is the responsibility of the installation engineer or operator owner of the device to ensure if necessary after consultation with the network operator that this device is only connected to a connection point with an Ssc value greater than or equal to 250 times the rated output of the arrangement 4 CONNECTION AND STARTUP 4 1 Mechanical connecti...

Page 7: ...e necessary to connect an additional protective earth conductor by way of the extra protective earth terminal provided on the device The protective earth terminal is located on the housing and provided with a protective earth symbol and a hole 4 2 2 Supply connection and fuses Assignment of supply cable cross sections and their required fuses line protection only no equipment protection Nominal vo...

Page 8: ...he corresponding terminals Use a screwdriver to do so When connecting ensure that no wire ends fan out Fig 2 Connecting wires to terminals Seal the terminal box 4 3 3 Cable routing Water must be prevented from reaching the cable gland along the cable NOTE Damage caused by moisture penetration Moisture can penetrate into the terminal box if water is constantly present at the cable glands To prevent...

Page 9: ... min 10 mA reinforced insulation on supply side and basic insulation on control interface side or reinforced insulation on control interface side up to 250 VAC potential difference 2 9 10 V red Fixed voltage output 10 VDC SELV 10 V 3 max 10 mA short circuit proof power supply for external devices e g pot fixed voltage input 24 VDC for setting parameters via MODBUS without line voltage supply 2 10 ...

Page 10: ...r find another remedy Operation with excessively high vibration levels can lead to premature failure The maximum permissible vibration severity must not exceed 3 5 mm s and should be checked at intervals of 6 months It is to be determined at the motor mount at the motor support plate at least in axial direction and transversely to this Measurement of the vibration in all three axes is recommended ...

Page 11: ...te from supply and remove mechanical blockage Line voltage faulty Check line voltage restore power supply Attention The error message resets automatically Device restarts automatically without warning Faulty connection Isolate from supply correct connection see connection diagram Broken motor winding Replace device Deficient cooling Improve cooling Let the device cool down To reset the error messa...

Page 12: ...apt the maintenance intervals to the actual level of dust exposure 6 3 Safety inspection NOTE High voltage test The integrated EMC filter has Y capacitors The tripping current is exceeded when AC testing voltage is applied Test the device with DC voltage when you perform the legally required high voltage test The voltage to be used corresponds to the peak value of the AC voltage required by the st...

Page 13: ...etallic materials are generally considered to be fully recyclable Separate the components for recycling into the following categories Steel and iron Aluminum Non ferrous metal e g motor windings Plastics particularly with brominated flame retardants in accordance with marking Insulating materials Cables and wires Electronic scrap e g circuit boards Only ferrite magnets and not rare earth magnets a...

Reviews: