ebm-papst K3G310-PT08-J2 Operating Instructions Manual Download Page 6

Operating instructions

K3G310-PT08-J2

Translation of the original operating instructions

Protection class

I (with customer connection of protective
earth)

Conformity with
standards

EN 61800-5-1; CE

Approval

CSA C22.2 No. 77 + CAN/CSA-
E60730-1; EAC; UL 1004-7 + 60730-1;
CCC

Comment

Conformity with EN 60335-1 in preparation

With regard to cyclic speed loads, note that the rotating parts of
the device are designed for a maximum of one million load
cycles. If you have special questions, consult ebm-papst for
support.

;

Use the device in accordance with its degree of protection.

Information on surface quality

The surfaces of the products conform to the generally applicable industrial
standard. The surface quality may change during the production period.
This has no effect on strength, dimensional stability and dimensional
accuracy.
The color pigments in the paints used perceptibly react to UV light over
the course of time. This does not however in any way affect the
technical properties of the products. The product is to be protected against
UV radiation to prevent the formation of patches and fading. Changes in
color are not a reason for complaint and are not covered by the warranty.

3.5 Mounting data

Strength class of
screws

8.8

;

Secure the screws against unintentional loosening (e.g. use self-
locking screws).

Any further mounting data required can be taken from the product
drawing or Section Chapter 4.1 Mechanical connection.

3.6 Transport and storage conditions

Max. permitted
ambient temp. for
motor (transport/
storage)

+80 °C

Min. permitted
ambient temp. for
motor (transport/
storage)

-40 °C

3.7 Electromagnetic compatibility

EMC immunity to
interference

According to EN 61000-6-2 (industrial
environment)

EMC interference
emission

According to EN 61000-6-3 (household
environment), except EN 61000-3-2 for
professionally used equipment with a
total rated power greater than 1 kW

If several devices are connected in parallel on the supply side
so that the line current of the arrangement is in the range 16 - 75
A, this arrangement conforms to IEC 61000-3-12, provided that
the short-circuit power S

sc at the connection point of the

customer system to the public power grid is greater than or
equal to 250 times the rated output of the arrangement. It is the
responsibility of the installation engineer or operator/owner of the
device to ensure, if necessary after consultation with the
network operator, that this device is only connected to a

connection point with an S

sc value greater than or equal to 250

times the rated output of the arrangement.

4. CONNECTION AND STARTUP

4.1 Mechanical connection

CAUTION
Risk of cutting and crushing when removing device
from packaging

→ Carefully remove the device from the packaging by grasping

hold of the frame. Never subject to any impact.

→ Wear safety shoes and cut-resistant safety gloves.

CAUTION
Heavy load when unpacking device

Risk of physical injury, such as back injuries.
→ Two people should work together to remove the device from

its packaging.

NOTE
Damage to the device from vibration

Bearing damage, shorter service life
→ The fan must not be subjected to force or excessive vibration

from sections of the installation.

→ If the fan is connected to air ducts, the connection should

be isolated from vibration, e.g. using compensators or similar
elements.

→ Ensure stress-free attachment of the fan to the

substructure.

;

The fan may not be handled in the area around the inlet nozzle during
transport and installation.
There is a risk of damage to the impeller.

;

Check the device for transport damage. Damaged devices are not to
be installed.

;

Install the undamaged device in accordance with your application.

4.1.1 Installation of RadiPac fan

Use is always to be made of appropriate hoisting equipment and a
suitable lifting device when transporting the fan for installation purposes.
Only suitable round slings are to be used for this purpose (see Chapter
3.4 Technical description for weight of product). Use four round slings
passed around the struts for lashing purposes. Position the round slings
as shown in the hoisting diagram below. Make sure that the struts of the
support bracket on the left and right of the motor are vertical. During
installation, only transport the fan in the installation position as shown in
the product drawing. Heed the information given on the device! During
transportation, an acceleration of 2 g must not be exceeded.

Item no. 54674-5-9970 · ENU · Change 212319 · Approved 2020-10-07 · Page 6 / 14

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for K3G310-PT08-J2

Page 1: ...permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules The safety hazards associated with the devic...

Page 2: ...ntact Before working on the system machine wait until all parts have come to a standstill WARNING Rotating device Long hair and dangling items of clothing jewelry and the like can become entangled and...

Page 3: ...nd Chapter 3 2 Nominal data Operating the device with all protective devices Following the operating instructions Improper use In particular operating the device in the following ways is prohibited an...

Page 4: ...rque 1 8 0 3 Nm 2 Cable diameter min 6 mm max 10 mm tightening torque 1 8 0 3 Nm use must be made of seal provided Cable diameter min 4 mm max 7 mm tightening torque 1 8 0 3 Nm 3 Tightening torque 1 5...

Page 5: ...dardized measurement setup 3 4 Technical description Weight 15 5 kg Size 310 mm Motor size 84 Rotor surface Painted black Terminal box material PP plastic Electronics housing material Die cast aluminu...

Page 6: ...250 times the rated output of the arrangement It is the responsibility of the installation engineer or operator owner of the device to ensure if necessary after consultation with the network operator...

Page 7: ...e device to circuits that can be switched off with an all pole disconnection switch 4 2 1 Requirements Check whether the information on the nameplate matches the connection data Before connecting the...

Page 8: ...s in mm inside terminal box Only strip the cable as far as necessary ensuring that the cable gland is sealed and there is no strain on the connections For tightening torques see Chapter 3 1 Product dr...

Page 9: ...meter set 2 PWM control Fan device address 01 Max PWM 100 Min PWM 5 Save set value to EEPROM Yes Set value requirement Analog linear Direction of action parameter set 1 Positive heating Direction of a...

Page 10: ...C1 min 10 mA reinforced insulation on supply side and basic insulation on control interface side 8 GND Reference ground for control interface SELV 9 RSA RS485 interface for MODBUS RSA SELV 10 RSB RS48...

Page 11: ...ng Either run through the resonant range as quickly as possible with speed control or find another remedy Operation with excessively high vibration levels can lead to premature failure The maximum per...

Page 12: ...eck line voltage restore power supply Attention The error message resets automatically Device restarts automatically without warning Faulty connection Isolate from supply correct connection see connec...

Page 13: ...aintenance intervals to the actual level of dust exposure 6 3 Safety inspection NOTE High voltage test The integrated EMC filter has Y capacitors The tripping current is exceeded when AC testing volta...

Page 14: ...tallic materials are generally considered to be fully recyclable Separate the components for recycling into the following categories Steel and iron Aluminum Non ferrous metal e g motor windings Plasti...

Reviews: