ebm-papst K3G310-AX52-91 Operating Instructions Manual Download Page 8

Operating instructions

K3G310-AX52-91

Translation of the original operating instructions

4.2.3 Reactive currents

Because of the EMC filter integrated for compliance with EMC
limits (interference emission and immunity to interference),
reactive currents can be measured in the supply line even
when the motor is at a standstill and the line voltage is switched
on.

The values are typically in the range < 250 mA

At the same time, the effective power in this operating state
(operational readiness) is typically < 5 W.

4.2.4 Residual current circuit breaker (RCCB)

If the use of a residual current device (RCD) is required in your
installation, only AC/DC-sensitive residual current devices
(type B or B+) are permissible. As with variable frequency
drives, residual current devices cannot provide personal safety
while operating the device. When the device power supply is
switched on, pulsed charging currents from the capacitors in the
integrated EMC filter can lead to the instant tripping of residual
current devices. We recommend the use of residual current
circuit breakers (RCCB) with a trip threshold of 300 mA and
delayed tripping (super-resistant, characteristic K).

4.2.5 Leakage current

For asymmetrical power systems or if a phase fails, the
leakage current can increase to a multiple of the nominal value.

4.2.6 Locked-rotor protection

Due to the locked-rotor protection, the starting current (LRA) is
equal to or less than the nominal current (FLA).

4.3 Connection in terminal box

4.3.1 Preparing cables for connection

Only strip the cable as far as necessary, ensuring that the cable gland is
sealed and there is no strain on the connections. For tightening torques,
see Chapter 3.1 Product drawing.

NOTE
Tightness and strain relief are dependent on the cable
used.

→ This must be checked by the user.

Fig. 2: Recommended stripped lengths in mm (inside terminal box)
Legend: CL = control lines

4.3.2 Connecting wires to terminals

WARNING
Live terminals and connections even with device
switched off

Electric shock
→ Wait five minutes after disconnecting the voltage at all poles

before opening the device.

;

Remove the cap from the cable gland.

Only remove caps where cables are fed in.

;

Equip the cable glands with the seals provided in the terminal box.

;

Route the wire(s) (not included in scope of delivery) into the terminal
box.

;

First connect the "PE" (protective earth).

;

Connect the wires to the corresponding terminals.

Use a screwdriver to do so.
When connecting, ensure that no wire ends fan out.

Fig. 3: Connecting wires to terminals

;

Seal the terminal box.

Item no. 51799-5-9970 · ENU · Change 210923 · Approved 2020-03-14 · Page 8 / 14

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for K3G310-AX52-91

Page 1: ...e permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules The safety hazards associated with the device must be assessed again following installation in the final product The locally applicable industrial safety regulations are always to be observed when working on the device Keep the workplace clean...

Page 2: ...fore working on the system machine wait until all parts have come to a standstill DANGER Ejected parts Missing protective devices may cause balancing weights or broken fan blades to be ejected and cause injuries Take appropriate safety measures WARNING Rotating device Long hair and dangling items of clothing jewelry and the like can become entangled and be pulled into the device Injuries can resul...

Page 3: ... Chapter 3 2 Nominal data Operating the device with all protective devices Following the operating instructions Improper use In particular operating the device in the following ways is prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to ...

Page 4: ...rtically as illustrated or rotor on bottom rotor on top on request 2 Inlet ring with pressure tap k factor 116 3 Cable diameter min 4 mm max 10 mm tightening torque 2 5 0 4 Nm 4 Tightening torque 3 5 0 5 Nm Item no 51799 5 9970 ENU Change 210923 Approved 2020 03 14 Page 4 14 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 0 7938 81 0 Fax 49 0 7938 81 110 info1 de ebmpapst com...

Page 5: ...data is determined using a motor impeller combination in a standardized measurement setup 3 4 Technical description Weight 16 8 kg Size 310 mm Motor size 112 Rotor surface Painted black Impeller material Sheet aluminum painted black Support plate material Sheet steel galvanized and painted black Support bracket material Steel galvanized and painted black Inlet nozzle material Sheet steel galvanize...

Page 6: ... ensure if necessary after consultation with the network operator that this device is only connected to a connection point with a Ssc value that is greater than or equal to 120 times the rated output of the arrangement 4 CONNECTION AND STARTUP 4 1 Mechanical connection CAUTION Risk of cutting and crushing when removing device from packaging Carefully remove the device from the packaging by graspin...

Page 7: ...to wires or cables Water ingress at the customer end of the cable can damage the device Make sure the end of the cable is connected in a dry environment Only connect the device to circuits that can be switched off with an all pole disconnection switch 4 2 1 Requirements Check whether the information on the nameplate matches the connection data Before connecting the device make sure the power suppl...

Page 8: ... multiple of the nominal value 4 2 6 Locked rotor protection Due to the locked rotor protection the starting current LRA is equal to or less than the nominal current FLA 4 3 Connection in terminal box 4 3 1 Preparing cables for connection Only strip the cable as far as necessary ensuring that the cable gland is sealed and there is no strain on the connections For tightening torques see Chapter 3 1...

Page 9: ...le gland for example When routing the cable make sure that the cable glands are located at the bottom The cables must always be routed downward Fig 4 Cable routing for fans installed upright 4 4 Factory settings Factory settings made for the device by ebm papst Mode parameter set 1 PWM control Mode parameter set 2 PWM control Fan device address 1 Max PWM 100 Min PWM 5 Save set value to EEPROM Yes ...

Page 10: ...o 100 modulation level KL3 2 8 GND Reference ground for control interface SELV KL3 3 7 0 10 V Use control current sensor value input 0 10 VDC impedance 100 kΩ only as alternative to 4 20 mA input SELV KL3 4 10 V Voltage output 10 VDC 3 max 10 mA power supply for external devices e g potentiometer SELV KL3 5 20 V Voltage output 20 VDC 25 10 max 50 mA power supply for external devices e g sensors SE...

Page 11: ...r find another remedy Operation with excessively high vibration levels can lead to premature failure The maximum permissible vibration severity must not exceed 3 5 mm s and should be checked at intervals of 6 months It is to be determined at the motor mount at the motor support plate at least in axial direction and transversely to this Measurement of the vibration in all three axes is recommended ...

Page 12: ...heck line voltage restore power supply Attention The error message resets automatically Device restarts automatically without warning Faulty connection Isolate from supply correct connection see connection diagram Broken motor winding Replace device Thermal overload protector activated Allow motor to cool off locate and rectify cause of error release restart lockout if necessary Deficient cooling ...

Page 13: ...apt the maintenance intervals to the actual level of dust exposure 6 3 Safety inspection NOTE High voltage test The integrated EMC filter has Y capacitors The tripping current is exceeded when AC testing voltage is applied Test the device with DC voltage when you perform the legally required high voltage test The voltage to be used corresponds to the peak value of the AC voltage required by the st...

Page 14: ...etallic materials are generally considered to be fully recyclable Separate the components for recycling into the following categories Steel and iron Aluminum Non ferrous metal e g motor windings Plastics particularly with brominated flame retardants in accordance with marking Insulating materials Cables and wires Electronic scrap e g circuit boards Only ferrite magnets and not rare earth magnets a...

Reviews: