
Operating instructions
K3G250-RO40-A2
Translation of the original operating instructions
Mounting of
protective
earth connection
Visual inspection At least every
6 months
Fasten
Check the
insulation of
the wires for
damage
Visual inspection At least every
6 months
Replace wires
Impeller for
wear/deposits/
corrosion and
damage
Visual inspection At least every
6 months
Clean or
replace impeller
Item no. 51752-5-9970 · Revision 82624 · Release 2014-05-08 · Page 11 / 11
ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com