ebm-papst G4E250-DA09-03 Operating Instructions Manual Download Page 4

Operating instructions

G4E250-DA09-03

Translation of the original operating instructions

3. TECHNICAL DATA

3.1 Product drawing

All dimensions in mm.

1

Cable silicone 6G 0.5 mm², 6x crimped splices

Item no. 16022-5-9970 · ENU · Change 226133 · Approved 2021-01-14 · Page 4 / 11

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for G4E250-DA09-03

Page 1: ...d by suitably qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installatio...

Page 2: ...ctromagnetic interference after installing the device in customer equipment Verify that the entire setup is EMC compliant 1 7 Mechanical movement DANGER Rotating device Risk of injury to body parts co...

Page 3: ...d be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the...

Page 4: ...ATA 3 1 Product drawing All dimensions in mm 1 Cable silicone 6G 0 5 mm 6x crimped splices Item no 16022 5 9970 ENU Change 226133 Approved 2021 01 14 Page 4 11 ebm papst Mulfingen GmbH Co KG Bachm hle...

Page 5: ...ith standards EN 60034 1 2010 Approval EAC With regard to cyclic speed loads note that the rotating parts of the device are designed for a maximum of one million load cycles If you have special questi...

Page 6: ...C between phase conductor and protective earth connection after switching off supply with multiple devices connected in parallel Electric shock risk of injury Ensure sufficient protection against acc...

Page 7: ...ked by the customer following installation in the end device 4 3 Connecting the cables The device has external leads First connect the PE protective earth Connect the cables according to your applicat...

Page 8: ...4 4 Connection diagram U1 blue Z brown U2 black PE green yellow TOP 2x gray Item no 16022 5 9970 ENU Change 226133 Approved 2021 01 14 Page 8 11 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mul...

Page 9: ...lacement WARNING Live terminals and connections even with device switched off Electric shock Wait five minutes after disconnecting the voltage at all poles before opening the device CAUTION Electric c...

Page 10: ...he actual level of dust exposure 5 2 Safety inspection What to check How to check How often What action Contact protection cover for intactness or damage Visual inspection At least every 6 months Repa...

Page 11: ...xternal rotor motors from ebm papst Mulfingen GmbH Co KG Ferrite magnets can be disposed of in the same way as normal iron and steel Electrical insulating materials on the product in cables and wires...

Reviews: