ebm-papst G4E180-AB01-01 Operating Instructions Manual Download Page 8

Operating instructions

G4E180-AB01-01

Translation of the original operating instructions

4.4 Connection diagram

U1

blue

Z

brown

U2

black

PE

green/yellow

Item no. 10296-5-9970 · ENU · Change 88814 · Approved 2016-08-25 · Page 8 / 11

·

·

·

·

·

·

Summary of Contents for G4E180-AB01-01

Page 1: ...and otherwise used by suitably qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the elect...

Page 2: ...he rotor or the impeller Secure the device against accidental contact Before working on the system machine wait until all parts have come to a standstill WARNING Rotating device Long hair and dangling...

Page 3: ...evice in the following ways is prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibratio...

Page 4: ...slation of the original operating instructions 3 TECHNICAL DATA 3 1 Product drawing All dimensions in mm 1 Cable PVC 4G 0 5 mm 4x crimped splices 2 For self tapping M4 screws Item no 10296 5 9970 ENU...

Page 5: ...tion of protective earth Conformity with standards EN 60335 1 CE Approval CCC With regard to cyclic speed loads note that the rotating parts of the device are designed for a maximum of one million loa...

Page 6: ...off with an all pole disconnection switch 4 2 1 Requirements Check whether the information on the nameplate matches the connection data If the motor run capacitor was not installed by ebm papst check...

Page 7: ...instructions 4 3 Connecting the cables The device has external leads First connect the PE protective earth Connect the cables according to your application When doing so observe Chapter 4 4 Connection...

Page 8: ...instructions G4E180 AB01 01 Translation of the original operating instructions 4 4 Connection diagram U1 blue Z brown U2 black PE green yellow Item no 10296 5 9970 ENU Change 88814 Approved 2016 08 25...

Page 9: ...ch When disconnecting be sure to disconnect the ground connection last 5 MAINTENANCE MALFUNCTIONS POSSIBLE CAUSES AND REMEDIES Do not perform any repairs on your device Send the device to ebm papst fo...

Page 10: ...f device Fastening the cables Visual inspection At least every 6 months Fasten Fastening the protective earth terminal Visual inspection At least every 6 months Fasten Insulation of cables for damage...

Page 11: ...to be treated in the same manner The materials concerned are as follows Miscellaneous insulators used in the terminal box Power cables Cables for internal wiring Electrolytic capacitors Dispose of el...

Reviews: