ebm-papst G1G160-BH29-52 Operating Instructions Manual Download Page 4

Operating instructions

G1G160-BH29-52

Translation of the original operating instructions

3. TECHNICAL DATA

3.1 Product drawing

All dimensions in mm.

1

Cable AWG 20, 4x crimped splices

Item no. 51179-5-9970 · ENU · Change 202174 · Approved 2018-12-27 · Page 4 / 10

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for G1G160-BH29-52

Page 1: ...horized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic sa...

Page 2: ...ll parts have come to a standstill A sign indicating hazards due to rotating parts must be attached near the fan in accordance with EN 60950 1 WARNING Rotating device Long hair and dangling items of c...

Page 3: ...hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan...

Page 4: ...ICAL DATA 3 1 Product drawing All dimensions in mm 1 Cable AWG 20 4x crimped splices Item no 51179 5 9970 ENU Change 202174 Approved 2018 12 27 Page 4 10 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 7...

Page 5: ...nce with its degree of protection Information on surface quality The surfaces of the products conform to the generally applicable industrial standard The surface quality may change during the producti...

Page 6: ...and has no disconnecting switch Only connect the device to circuits that can be switched off with an all pole disconnection switch When working on the device secure the system machine in which the de...

Page 7: ...red Power supply 24 VDC maximum ripple 3 5 1 2 0 10 VDC yellow Control input Re 100k 1 3 Tach white Tach output 3 pulses per revolution Isink max 10 mA 1 4 GND blue Reference ground Item no 51179 5 99...

Page 8: ...switch the motor e g in cyclic operation on and off via power supply Disconnect the device from the power supply 5 MAINTENANCE MALFUNCTIONS POSSIBLE CAUSES AND REMEDIES Do not perform any repairs on y...

Page 9: ...l protection and resource preservation are top priority corporate goals ebm papst operates an environmental management system which is certified in accordance with ISO 14001 and rigorously implemented...

Page 10: ...ploying the proper procedures for electronic scrap Please contact ebm papst for any other questions on disposal Item no 51179 5 9970 ENU Change 202174 Approved 2018 12 27 Page 10 10 ebm papst Mulfinge...

Reviews: