ebm-papst A8D800-AH01-01 Operating Instructions Manual Download Page 4

Operating instructions

A8D800-AH01-01

Translation of the original operating instructions

3. TECHNICAL DATA

3.1 Product drawing

All dimensions in mm.

1

Direction of air flow "V"

2

Max. clearance for screw 18 mm

3

Tightening torque 1.5 ± 0.2 Nm

4

Cable diameter min. 7 mm, max. 14 mm, tightening torque 2 ± 0.3 Nm

Item no. 10180-5-9970 · ENU · Change 219827 · Approved 2021-01-26 · Page 4 / 12

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for A8D800-AH01-01

Page 1: ...itably qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 B...

Page 2: ...the system machine wait until all parts have come to a standstill WARNING Rotating device Long hair and dangling items of clothing jewelry and the like can become entangled and be pulled into the dev...

Page 3: ...g the device in the following ways is prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe v...

Page 4: ...ion of air flow V 2 Max clearance for screw 18 mm 3 Tightening torque 1 5 0 2 Nm 4 Cable diameter min 7 mm max 14 mm tightening torque 2 0 3 Nm Item no 10180 5 9970 ENU Change 219827 Approved 2021 01...

Page 5: ...tion with cable Axial Protection class I with customer connection of protective earth Conformity with standards EN 60034 1 2010 Comment on CE Commissioning not permitted in the European Economic Area...

Page 6: ...specified installation regulations for voltage current insulation material capacity etc Route cables so that they cannot be touched by any rotating parts DANGER Electrical charge 50 C between phase co...

Page 7: ...e gland Only remove caps where cables are fed in Route the wire s not included in scope of delivery into the terminal box First connect the PE protective earth Connect the wires to the corresponding t...

Page 8: ...pped with thermal overload protectors to protect the devices Check to make sure that the thermal overload protector is correctly connected before each operation Failure to connect the thermal overload...

Page 9: ...tion Y Star connection L1 U1 black L2 V1 blue L3 W1 brown W2 yellow U2 green V2 white TOP 2x gray PE green yellow Item no 10180 5 9970 ENU Change 219827 Approved 2021 01 26 Page 9 12 ebm papst Mulfing...

Page 10: ...inexpert handling transportation damage and resultant imbalance or be caused by component or structural resonance Speed ranges with excessively high vibration levels and possibly resonant frequencies...

Page 11: ...d replace it Repair of load bearing or rotating parts is not permitted Operate the fan for 2 hours at maximum speed so that any water that has ingressed can evaporate If cleaning does not eliminate vi...

Page 12: ...tallic materials are generally considered to be fully recyclable Separate the components for recycling into the following categories Steel and iron Aluminum Non ferrous metal e g motor windings Plasti...

Reviews: