5.3.1 Country-specific legal requirements

NOTE
Country-specific legal requirements

Always observe the applicable country-specific legal
regulations with regard to the disposal of products or waste
occurring in the various phases of the life cycle. The
corresponding disposal standards are also to be heeded.

5.3.2 Disassembly

Disassembly of the product must be performed or supervised by
qualified personnel with the appropriate technical knowledge.
The product is to be disassembled into suitable components for disposal
employing standard procedures for motors.

WARNING
Heavy parts of the product may drop off. Some of the
product components are heavy. These components
could drop off during disassembly.

This can result in fatal or serious injury and material damage.
→ Secure components before unfastening to stop them falling.

5.3.3 Component disposal

The products are mostly made of steel, copper, aluminum and plastic.
Metallic materials are generally considered to be fully recyclable.
Separate the components for recycling into the following categories:

Steel and iron

Aluminum

Non-ferrous metal, e.g. motor windings

Plastics, particularly with brominated flame retardants, in accordance
with marking

Insulating materials

Cables and wires

Electronic scrap, e.g. circuit boards

Only ferrite magnets and not rare earth magnets are used in external
rotor motors from ebm-papst Mulfingen GmbH & Co. KG.

;

Ferrite magnets can be disposed of in the same way as normal iron
and steel.

Electrical insulating materials on the product, in cables and wires are
made of similar materials and are therefore to be treated in the same
manner.
The materials concerned are as follows:

Miscellaneous insulators used in the terminal box

Power cables

Cables for internal wiring

Electrolytic capacitors

Dispose of electronic components employing the proper procedures for
electronic scrap.

→ Please contact ebm-papst for any other questions on disposal.

Item no. 10124-5-9970 · ENU · Change 230069 · Approved 2021-03-15 · Page 12 / 12

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for A6E630-AN01-01

Page 1: ... authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules The safety hazards associated with the device must be assessed again following installation in the final product The locally applicable industrial safety regulations are always to be ob...

Page 2: ... the impeller Secure the device against accidental contact Before working on the system machine wait until all parts have come to a standstill WARNING Rotating device Long hair and dangling items of clothing jewelry and the like can become entangled and be pulled into the device Injuries can result Do not wear any loose fitting or dangling clothing or jewelry while working on rotating parts Protec...

Page 3: ...e hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan from the customer installation Operation in medical equipment with a life sustaining or life support function Conveying solids in the flow medium Painting the device Connections e g screws coming loo...

Page 4: ...tion of air flow V 2 Max clearance for screw 12 mm 3 Tightening torque 1 5 0 2 Nm 4 Cable diameter min 6 mm max 12 mm tightening torque 2 0 3 Nm Item no 10124 5 9970 ENU Change 230069 Approved 2021 03 15 Page 4 12 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 0 7938 81 0 Fax 49 0 7938 81 110 info1 de ebmpapst com www ebmpapst com ...

Page 5: ...Terminal box material PP plastic Blade material Press fitted sheet steel blank sprayed with PP plastic Number of blades 5 Airflow direction V Direction of rotation Counterclockwise viewed toward rotor Degree of protection IP54 Insulation class F Moisture F Environmental H protection class H2 Installation position Shaft horizontal or rotor on bottom rotor on top on request Condensation drainage hol...

Page 6: ... motor capacitor with safety protection class P0 S0 according to EN 60252 1 Take this into consideration when fitting it to the end product on the basis of applicable regulations CAUTION Possible damage to the device If the device slips during installation serious damage can result Ensure that the device is securely positioned at its place of installation until all fastening screws have been tight...

Page 7: ...wing installation in the end device 4 2 4 Variable frequency drive Please use a variable frequency drive only after consultation with ebm papst For operation with variable frequency drives install sinusoidal filters that work on all poles phase phase and phase ground between the drive and the motor During operation with variable frequency drives an all pole sine filter protects the motor against h...

Page 8: ...When working on the device secure the system machine in which the device is installed so as to prevent it from being switched back on NOTE Lack of motor protection Without motor protection the motor can overheat and suffer damage Connect the thermal overload protector installed in the winding The motors are equipped with thermal overload protectors to protect the devices Check to make sure that th...

Page 9: ...s 4 4 Connection diagram L U1 blue Z brown N U2 black PE green yellow TOP gray Item no 10124 5 9970 ENU Change 230069 Approved 2021 03 15 Page 9 12 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 0 7938 81 0 Fax 49 0 7938 81 110 info1 de ebmpapst com www ebmpapst com ...

Page 10: ...ant imbalance or be caused by component or structural resonance Speed ranges with excessively high vibration levels and possibly resonant frequencies must be determined in the course of fan commissioning Either run through the resonant range as quickly as possible with speed control or find another remedy Operation with excessively high vibration levels can lead to premature failure 4 8 Switching ...

Page 11: ... the device immediately and replace it Repair of load bearing or rotating parts is not permitted Operate the fan for 2 hours at maximum speed so that any water that has ingressed can evaporate If cleaning does not eliminate vibrations the fan may need to be rebalanced To have it rebalanced contact ebm papst The fan is equipped with maintenance free ball bearings The lifetime lubrication of the bal...

Page 12: ...etallic materials are generally considered to be fully recyclable Separate the components for recycling into the following categories Steel and iron Aluminum Non ferrous metal e g motor windings Plastics particularly with brominated flame retardants in accordance with marking Insulating materials Cables and wires Electronic scrap e g circuit boards Only ferrite magnets and not rare earth magnets a...

Reviews: