background image

Operating instructions

A6D630-AN01-35

Translation of the original operating instructions

3. TECHNICAL DATA

3.1 Product drawing

All dimensions in mm.

1

Direction of air flow "A"

2

Max. clearance for screw 12 mm

3

Tightening torque 1.5 ± 0.2 Nm

4

Cable diameter min. 6 mm, max. 12 mm, tightening torque 2 ± 0.3 Nm

Item no. 16289-5-9970 · ENU · Change 230069 · Approved 2021-03-15 · Page 4 / 12

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for A6D630-AN01-35

Page 1: ... authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules The safety hazards associated with the device must be assessed again following installation in the final product The locally applicable industrial safety regulations are always to be ob...

Page 2: ...n the system machine wait until all parts have come to a standstill WARNING Rotating device Long hair and dangling items of clothing jewelry and the like can become entangled and be pulled into the device Injuries can result Do not wear any loose fitting or dangling clothing or jewelry while working on rotating parts Protect long hair with a cap 1 7 Emissions WARNING Depending on the installation ...

Page 3: ...following ways is prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan from the customer installation Operation in medical equipment with a life sustaining or life support function Conveying solids in the flow medium Painting the ...

Page 4: ...tion of air flow A 2 Max clearance for screw 12 mm 3 Tightening torque 1 5 0 2 Nm 4 Cable diameter min 6 mm max 12 mm tightening torque 2 0 3 Nm Item no 16289 5 9970 ENU Change 230069 Approved 2021 03 15 Page 4 12 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 0 7938 81 0 Fax 49 0 7938 81 110 info1 de ebmpapst com www ebmpapst com ...

Page 5: ... surface Painted black Terminal box material PP plastic Blade material Press fitted painted sheet steel blank sprayed with PP plastic Number of blades 5 Airflow direction A Direction of rotation Clockwise viewed toward rotor Degree of protection IP54 Insulation class F Moisture F Environmental H protection class H2 A Ambient temperature note Occasional start up at temperatures between 40 C and 25 ...

Page 6: ...ts place of installation until all fastening screws have been tightened The fan must not be strained on fastening 4 2 Electrical connection DANGER Voltage on the device Electric shock Always connect a protective earth first Check the protective earth DANGER Faulty insulation Risk of fatal injury from electric shock Use only cables that meet the specified installation regulations for voltage curren...

Page 7: ...of the motor when using a variable frequency drive must be checked by the customer following installation in the end device 4 3 Connection in terminal box 4 3 1 Preparing cables for connection Only strip the cable as far as necessary ensuring that the cable gland is sealed and there is no strain on the connections For tightening torques see Chapter 3 1 Product drawing NOTE Tightness and strain rel...

Page 8: ...e the system machine in which the device is installed so as to prevent it from being switched back on NOTE Lack of motor protection Without motor protection the motor can overheat and suffer damage Connect the thermal overload protector installed in the winding The motors are equipped with thermal overload protectors to protect the devices Check to make sure that the thermal overload protector is ...

Page 9: ...ection Y Star connection L1 U1 black L2 V1 blue L3 W1 brown W2 yellow U2 green V2 white TOP 2x gray PE green yellow Item no 16289 5 9970 ENU Change 230069 Approved 2021 03 15 Page 9 12 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 0 7938 81 0 Fax 49 0 7938 81 110 info1 de ebmpapst com www ebmpapst com ...

Page 10: ... inexpert handling transportation damage and resultant imbalance or be caused by component or structural resonance Speed ranges with excessively high vibration levels and possibly resonant frequencies must be determined in the course of fan commissioning Either run through the resonant range as quickly as possible with speed control or find another remedy Operation with excessively high vibration ...

Page 11: ...t treated by the stationary soaking installation in the barn they have to be manually soaked separately using a hosepipe or knapsack sprayer for example Instructions for cleaning Fig 5 Cleaning of the fan with a high pressure cleaner Maximum water pressure 80 bar Minimum clearance between water outlet and fan 40 cm The water jet must be aimed perpendicularly to the blades If possible only aim the ...

Page 12: ...ied personnel with the appropriate technical knowledge The product is to be disassembled into suitable components for disposal employing standard procedures for motors WARNING Heavy parts of the product may drop off Some of the product components are heavy These components could drop off during disassembly This can result in fatal or serious injury and material damage Secure components before unfa...

Reviews: