ebm-papst A4E450-BA09-01 Operating Instructions Manual Download Page 8

Operating instructions

A4E450-BA09-01

Translation of the original operating instructions

4.3.3 Cable routing

Water must be prevented from reaching the cable gland along the cable.

NOTE
Damage caused by moisture penetration.

Moisture can penetrate into the terminal box if water is
constantly present at the cable glands.
→ To prevent the constant accumulation of water at the cable

glands, the cable should be routed in a U-shaped loop
wherever possible.

→ If this is not possible, a drip edge can be produced by

fitting a cable tie directly in front of the cable gland for example.

Fans installed lying flat

Make sure the cable is routed in a U-shaped loop.

Fig. 2: Fan installed lying flat, cable routed in a U-shaped loop.

Fans installed upright

When routing the cable, make sure that the cable glands are located at
the bottom. The cables must always be routed downward.

Fig. 3: Cable routing for fans installed upright.

4.3.4 Motor protection

CAUTION
Voltage

The device is a built-in component and has no disconnecting
switch.
→ Connect the device to a suitable tripping unit.
→ Only connect the device to circuits that can be switched

off with an all-pole disconnection switch.

→ When working on the device, secure the system/

machine in which the device is installed so as to prevent it
from being switched back on.

NOTE
Lack of motor protection

Without motor protection, the motor can overheat and suffer
damage.
→ Connect the thermal overload protector installed in the

winding.

The motors are equipped with thermal overload protectors to protect the
devices.
Check to make sure that the thermal overload protector is correctly
connected before each operation.
Failure to connect the thermal overload protector correctly will
invalidate your warranty claim.

Item no. 13461-5-9970 · ENU · Change 205900 · Approved 2020-03-10 · Page 8 / 12

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for A4E450-BA09-01

Page 1: ...cal staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules The...

Page 2: ...r installing the device in customer equipment Verify that the entire setup is EMC compliant 1 7 Mechanical movement DANGER Rotating device Risk of injury to body parts coming into contact with the rot...

Page 3: ...unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan from the customer installation Operati...

Page 4: ...ion of air flow V 2 Max clearance for screw 12 mm 3 Tightening torque 1 5 0 2 Nm 4 Cable diameter min 6 mm max 12 mm tightening torque 2 0 3 Nm Item no 13461 5 9970 ENU Change 205900 Approved 2020 03...

Page 5: ...ration Specific ratio 1 pfs 100 000 Pa Data obtained at optimum efficiency level The ErP data is determined using a motor impeller combination in a standardized measurement setup 3 4 Technical descrip...

Page 6: ...sure the impeller moves easily and that the blades of the impeller are not deformed or bent and do not catch at any point NOTE Damage to the device from vibration Bearing damage shorter service life...

Page 7: ...equency drives residual current devices cannot provide personal safety while operating the device 4 2 3 Voltage control NOTE Current overshoots may occur if speed control is implemented by transformer...

Page 8: ...routing for fans installed upright 4 3 4 Motor protection CAUTION Voltage The device is a built in component and has no disconnecting switch Connect the device to a suitable tripping unit Only connect...

Page 9: ...4 4 Connection diagram L U1 blue Z brown N U2 black PE green yellow TOP gray Item no 13461 5 9970 ENU Change 205900 Approved 2020 03 10 Page 9 12 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mu...

Page 10: ...nt imbalance or be caused by component or structural resonance Speed ranges with excessively high vibration levels and possibly resonant frequencies must be determined in the course of fan commissioni...

Page 11: ...the device immediately and replace it Repair of load bearing or rotating parts is not permitted Operate the fan for 2 hours at maximum speed so that any water that has ingressed can evaporate If clean...

Page 12: ...tallic materials are generally considered to be fully recyclable Separate the components for recycling into the following categories Steel and iron Aluminum Non ferrous metal e g motor windings Plasti...

Reviews: